Energy-saving construction waste treatment system and method for civil engineering
A construction waste and civil engineering technology, applied in the direction of grain processing, etc., can solve the problems of difficult direct utilization of construction waste, and achieve the effect of reducing occupation, saving building materials, and high utilization rate
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0056] Please refer to figure 1 , the present embodiment provides a construction waste treatment system 100 for civil engineering, which is mainly used for crushing construction waste (such as hollow bricks) into granules for reuse. The above-mentioned treatment system 100 includes crushing equipment 110 and extrusion equipment 120, wherein the crushing equipment 110 is used to break large pieces of construction waste into small pieces, and the construction waste after preliminary crushing falls into the extrusion equipment 120 below, and the crushing equipment 120 is passed through the extrusion crushing by extrusion.
[0057] Specifically, the crushing equipment 110 includes a casing 115 , a driving motor 114 , a first rotating shaft 111 and a second rotating shaft 112 , the casing 115 is fixedly connected to the foundation, and the two rotating shafts are arranged in the casing 115 in parallel and spaced apart. The shell 115 is a structure with a large middle part and smal...
Embodiment 2
[0080] This embodiment provides a method for processing construction waste for civil engineering, which uses the processing system 100 in Embodiment 1, including the following steps:
[0081] a. Broken: Throw blocky construction waste between the two rotating shafts of the crushing equipment 110, and make the two rotating shafts rotate in the same direction; wherein the striking rod 113 of the first rotating shaft 111 hits the construction waste upwards, and the second rotating shaft 112 The striking stick hits downward, and the rotational speed of the first rotating shaft 111 is smaller than the rotating speed of the second rotating shaft 112;
[0082] B. extrude; After the construction waste falling from the crushing equipment 110 falls into a pile in the extrusion equipment 120, close the crushing equipment 110 and start the hydraulic system of the extrusion equipment 120; Squeeze the construction waste towards the fixed plate 131, and the pressure sensor transmits the pres...