Unlock instant, AI-driven research and patent intelligence for your innovation.

Information broadcasting system for rail traffic system

A technology for rail transit and information broadcasting, which is applied to signal indicators on vehicles, railway signals, railway signals and safety, etc. It can solve the problems that the display effect is not obvious, and passengers cannot understand the fault or early warning information at the first time. Improve the display effect, enhance the user experience, and improve the effect of the waiting environment

Active Publication Date: 2019-02-12
西藏谦诚信息科技有限公司
View PDF6 Cites 4 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0006] At present, train information is usually displayed on an external monitor. Due to the limitation of the size of the monitor, the display effect is often not obvious; fault information or early warning information is displayed to the staff in the platform control room, and passengers often cannot understand the fault or early warning information at the first time. As a part of the subway screen door system, the platform fixed door only plays the role of isolation in the existing technology, and fails to make full use of its large area and good vision

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Information broadcasting system for rail traffic system
  • Information broadcasting system for rail traffic system
  • Information broadcasting system for rail traffic system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0049] The present invention provides a method for track fault monitoring and intelligent early warning system, such as figure 1 shown, including:

[0050] Data receiving module 100: for receiving the train information transmitted by the central control module 500, for receiving the fault information or early warning information transmitted by the rail transit fault monitoring and early warning module 600; for transmitting the train information, fault information and early warning information to the data processing module 200;

[0051] Data processing module 200: be used for sending to data storage module 300 the first play signal that is used for playing preset play data; Be used for receiving the train information that data receiving module 100 transmits, fault information and early warning information, and generate for playing The second broadcast information of the train information is used to broadcast fault information or early warning information and the third broadcas...

Embodiment 2

[0066] Compared with Embodiment 1, this embodiment has the following differences: as Figure 4~5 As shown, the area of ​​the transparent liquid crystal screen 3 in the display module 400 is smaller than the area of ​​the transparent glass 2 .

[0067] This embodiment is applicable to the case where the glass 2 of the fixed door 1 of the platform is too large, and the visual effect of information broadcasting is improved by adjusting the size of the transparent liquid crystal screen 3 .

Embodiment 3

[0069] Compared with Embodiment 1, this embodiment has the following differences: as Figure 6~7 As shown, the display module 400 is provided with three independent transparent liquid crystal screens 3, wherein one transparent liquid crystal screen 3 plays preset content, one transparent liquid crystal screen 3 plays train information, and one transparent liquid crystal screen 3 plays fault information or warning information; It is also possible for two of the transparent liquid crystal screens 3 to play preset content, and another transparent liquid crystal screen 3 to play train information, fault information or early warning information.

[0070]During the use of this embodiment, when no train enters the platform, the data processing module 200 sends the first broadcast signal to the data storage module 300, and the data storage module 300 displays and plays the preset broadcast content through a transparent liquid crystal screen 3; After the data receiving module 100 recei...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses an information broadcasting system for a rail traffic system. The information broadcasting system comprises a data receiving module, a data processing module, a data storing module, a display module, a central control module and a rail traffic failure monitoring and early warning module; when no train travels into a station, the display module displays the preset content; when the data receiving module receives train information, failure information or early warning information, the display module displays the corresponding train information, failure information or early warning information; and when a train travels into the station, broadcasting of the preset content is stopped, and a liquid crystal screen is transparent. According to the information broadcasting system for the rail traffic system, through the prior sequence, the train information, the failure information or the early warning information and other information are transmitted to passengers through the same display system, thus the passengers learn the operating situation of the rail traffic system in the first time, the displaying effect is improved, the station environment is beautified, and the more comfortable environment is provided for the passengers waiting for the train on the station.

Description

technical field [0001] The invention relates to the field of rail transit safety, in particular to an information broadcasting system for timely feeding back train information, fault information and early warning information of a rail transit system to users. Background technique [0002] With the increasing population of big cities, road traffic is increasingly unable to meet the rapidly increasing traffic usage of people. The development of urban rail transit plays an important role in alleviating urban traffic congestion. Since the first subway was built in London in 1863, the subway, as an important means of urban rail transit, has been widely used in developed countries such as Europe and the United States, as well as domestic Beijing, Shanghai, Guangzhou, Shenzhen and other developed areas. [0003] The platform screen door of urban rail transit is installed on the edge of the platform of the subway, light rail and other transportation stations to isolate the track fro...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): B61L15/00B61L23/00
CPCB61L15/009B61L23/00
Inventor 刘春梅
Owner 西藏谦诚信息科技有限公司