Pre-tensioning pre-stressed pipe pile connector and pipe pile connecting method

A technology for prestressed pipe piles and connecting joints, which is applied in sheet pile walls, buildings, infrastructure projects, etc., can solve the problems of reducing concrete strength, low construction efficiency, and difficulty in meeting the requirements, and achieves easy installation and construction, and improves construction efficiency. simple structure

Pending Publication Date: 2019-02-12
常德定海管桩有限公司
View PDF0 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] The existing pipe pile construction is connected by welding. The two ends of the pipe pile body are installed with prestressed main reinforcement anchoring end plates. The connection between the pipe pile and the lower pipe pile is to complete the construction connection of the upper pipe pile and the lower pipe pile by welding the groove and filling the weld seam. This welding connection method not only has complicated construction procedures and low construction efficiency, but also generally has defects caused by welding. The high temperature burns the concrete at the junction of the upper pipe pile and the lower pipe pile, thereby reducing the strength of the concrete. In addition, welding has an annealing effect on the material of the prestressed anchorage end plate, thereby reducing the mechanical properties of the steel, resulting in the resistance of the pipe pile in the weak foundation. Compressive, bending, and pulling properties are affected to a certain extent, and it is difficult to meet the technical requirements of current engineering construction

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Pre-tensioning pre-stressed pipe pile connector and pipe pile connecting method
  • Pre-tensioning pre-stressed pipe pile connector and pipe pile connecting method
  • Pre-tensioning pre-stressed pipe pile connector and pipe pile connecting method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0031] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

[0032] The purpose of the present invention is to provide a pre-tensioned prestressed pipe pile connection joint and a reinforcement method to solve the problems in the prior art, greatly reduce the damage to the original structure of the reinforcement measures, strong durability, high construction efficiency, It can ensure that the reconstructed structure has safe and reliable stress strength.

[0033] In order to make the above objects, features and advantag...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a pre-tensioning pre-stressed pipe pile connector and a pipe pile connecting method, and belongs to the technical field of weak foundations of buildings. The pre-tensioning pre-stressed pipe pile connector comprises a pre-stressed main bar anchoring end plate and a tensioning anchoring end plate, wherein the pre-stressed main bar anchoring end plate and the tensioning anchoring end plate are parallel to each other and are connected through a main cylinder; and anchoring rods used for anchoring a pre-stressed pipe pile main bar are formed in the pre-stressed main bar anchoring end plate, and bolt holes opposite to the anchoring holes are formed in the tensioning anchoring end plate. The pre-tensioning pre-stressed pipe pile connector is anchored to the connection endof a pipe pile so that an upper pipe pile and a lower pipe pile can be connected directly through anchoring bolts, concrete and steel at the joint of the pipe piles are prevented from being damaged,and the crush resistance, bending resistance and pulling resistance of the pipe piles are ensured; the structure is simple, and the construction efficiency is effectively improved; and in addition, when a prestressed pipe pile is manufactured, the bolt holes can be matched with an external flange plate to control the tension of the pre-stressed main bar.

Description

technical field [0001] The invention relates to the technical field of building weak foundations, in particular to a pretensioned prestressed pipe pile connection joint and a pipe pile connection method. Background technique [0002] The existing pipe pile construction is connected by welding. The two ends of the pipe pile body are installed with prestressed main reinforcement anchoring end plates. The connection between the pipe pile and the lower pipe pile is to complete the construction connection of the upper pipe pile and the lower pipe pile by welding the groove and filling the weld seam. This welding connection method not only has complicated construction procedures and low construction efficiency, but also generally has defects caused by welding. The high temperature burns the concrete at the junction of the upper pipe pile and the lower pipe pile, thereby reducing the strength of the concrete. In addition, welding has an annealing effect on the material of the prest...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): E02D5/52E02D5/58
CPCE02D5/526E02D5/58E02D2600/20E02D2300/0026E02D2250/0046
Inventor 陈克学黄吉宁
Owner 常德定海管桩有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products