A construction method and corridor technology, which is applied in the direction of infrastructure engineering, gravity dams, dams, etc., can solve the problems of unsmooth passage, inconvenient passage of people, and inconvenient passage in the corridors on the left and right bank slopes, so as to achieve safe and convenient passage, improve The effect of construction efficiency and fast construction speed
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0022] The present invention is described in detail below in conjunction with accompanying drawing:
[0023] Such as Figure 1-3 As shown, the temporary traffic corridor structure includes the main body of the corridor. The ports 2 are connected with each other, and the port 1 outside the corridor or the port 2 inside the corridor are connected to each other. The shape of the section is rectangular. For safe traffic passages, a water-stop sheet 4 is arranged around the outer port 1 of the corridor or the inner port 2 of the corridor, and a layer of steel mesh is arranged on the side walls and roof of the main body of the corridor, and the steel mesh includes interconnected vertical stress Steel bars 5-1 and horizontally distributed steel bars 5-2, and a protective layer of steel bars is set outside the steel mesh.
[0024] Specifically, a keyway 3 is provided on the corridor bottom plate of the corridor main body and the water-stop sheet 4 side of the corridor side wall to p...