Unlock instant, AI-driven research and patent intelligence for your innovation.

Assembled precast concrete balcony

A prefabricated concrete and prefabricated technology, applied to balconies, building components, buildings, etc., can solve the problems of difficult transportation, cumbersome construction, waste of materials, etc., and achieve the effects of firm connection, improved industrialization efficiency, and convenient construction

Inactive Publication Date: 2019-02-26
SHENYANG JIANZHU UNIVERSITY
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Benefits of technology

This technology uses less material than traditional methods like brick or concrete for building structures instead of requiring more materials at once. It saves resources while also being environmentally friendly due to its ability to be easily built without relying on fossil fuels that can pollute our airways over time. Additionally, this method allows for quicker assembly times with stronger connections between components compared to previous ways such as cementing them together.

Problems solved by technology

This patented technical problem addressed by the present inventors relates to improving the strength and durability of premade frames for use during building constructions such as buildings without sacrificial materials like concrete blocks being placed on top of each other due to their low weight compared to traditional methods. Previous solutions have involved adding extra reinforcement bars around certain parts of the framework, which may increase its cost significantly over time.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Assembled precast concrete balcony
  • Assembled precast concrete balcony
  • Assembled precast concrete balcony

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0021] Example: such as Figure 1~9 As shown, an assembled prefabricated concrete balcony of the present invention includes a precast concrete main beam 1, a precast concrete cantilever beam 2, a precast concrete beam 3, a prefabricated balcony plate 4, nuts 5, and bolts 6. The precast concrete main beam 1 The middle position of the beam top of the main beam body 1-1 is provided with a reserved empty slot 1-2, and a horizontal connecting frame 1-2 is provided inside the concrete at the horizontal connection between the main beam body 1-1 and the reserved empty slot 1-2 3. Three horizontal connection installation ports 1-4 are arranged on average on the horizontal connection frame 1-3, and the diameter of the horizontal connection installation port 1-4 is set between the horizontal connection installation port 1-4 and the reserved empty slot 1-2. The reserved holes A1-5 are connected, the inner side of the cantilever beam body 2-1 of the prefabricated concrete cantilever beam 2...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention belongs to the technical field of architectures, and particularly relates to an assembled precast concrete balcony. The assembled precast concrete balcony comprises a precast concrete main beam, precast concrete suspended arm beams, a precast concrete cross beam, a precast balcony plate, nuts and bolts; a reserved empty groove is formed in the middle of a beam top of a main beam bodyof the precast concrete main beam, a transverse connection rack is arranged in concrete at a horizontal connection portion of the main beam body and the reserved empty groove, three transverse connection mounting ports are evenly formed in the transverse connection rack, and reserved holes A of which the diameter is equal to that of the transverse connection mounting ports are formed in the portion between the transverse connection mounting ports and the reserved empty groove. The assembled precast concrete balcony has the advantages of adopting dry construction, saving energy, reducing resource loss, being environmentally friendly, high in bearing capacity and construction speed, convenient to construct and transport and firm in connection, shortening the labor-hour, and obviously improving the industrialization efficiency.

Description

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Owner SHENYANG JIANZHU UNIVERSITY