Directional isolation deep soil displacement high-pressure air column pile and construction method
A technology of high-pressure gas and deep soil, which is applied in the direction of foundation structure engineering, on-site foundation soil survey, protection devices, etc., can solve the problems of controlling unfavorable deformation and enlargement of tunnels, and achieve accurate and reasonable unfavorable displacement and the effect of blocking unfavorable displacement
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0033]The first is the design of the high-pressure air column 1, which mainly includes the A-side high-pressure airbag 2, the B-side high-pressure airbag 3, the middle partition 4 and the upper and lower connection plates 12. An earth pressure sensor 8 is installed on the outside of the high-pressure airbag, and a displacement gauge 7 is installed inside the high-pressure airbag 2 on the A side. The B-side high-pressure airbag 3 has the same structure as the A-side high-pressure airbag 2 and is separated by a middle partition 4 . A pipeline passage 5 is arranged in the middle partition 4 , and the inflation tube in the high-pressure air bag enters the pipeline passage 5 through the air pipe opening 6 , and an air pipe joint 13 is provided on the top of the connecting plate 12 . Bolt holes 9 and sealing rubber rings 11 are left on the connection plate 12, and each section of high-pressure gas column 1 can be connected together by bolts 10. The sealing rubber ring 11 can preven...
Embodiment 2
[0041] The construction method of the directional isolation deep soil displacement high-pressure air column pile comprises the following steps:
[0042] 1. According to the distance between the underground structure to be protected and the periphery of the foundation pit, determine the position where the high-pressure gas column pile needs to be set up and the corresponding layout method of the high-pressure gas column pile. Double-row dislocation arrangement or plum blossom arrangement can be adopted.
[0043] 2. Before excavating the foundation pit, determine the depth of the required drilling according to the depth of the ground connection wall or the depth of the protected underground structure, and then the drilling machine is in place to start drilling.
[0044] 3. After the drilling is completed, start to lower the high-pressure gas column 1 immediately. After lowering one section, connect the hole with the next section through bolts until the requirements are met. Afte...
PUM
Property | Measurement | Unit |
---|---|---|
diameter | aaaaa | aaaaa |
length | aaaaa | aaaaa |
thickness | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com