Rigid connection device and assembly method for pile and cap for pile foundation model test
A model test, rigid connection technology, applied in the test of basic structure, basic structure engineering, construction, etc., can solve problems such as prototype offset, and achieve the effect of easy operation, small size and simple structure
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0043] It should be pointed out that the following detailed description is exemplary and intended to provide further explanation to the present application. Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this application belongs.
[0044] It should be noted that the terminology used here is only for describing specific implementations, and is not intended to limit the exemplary implementations according to the present application. As used herein, unless the context clearly dictates otherwise, the singular is intended to include the plural, and it should also be understood that when the terms "comprising" and / or "comprising" are used in this specification, they mean There are features, steps, operations, means, components and / or combinations thereof;
[0045] For the convenience of description, if the words "up" and "down" appear in the present invention, it only...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


