Tunnel pipe roof construction method and device
A construction method and technology of construction devices, which are applied in tunnels, tunnel linings, shaft equipment and other directions, can solve the problem of not disclosing the opening sequence of pipe shed holes, the inability to measure the construction deflection of pipe sheds, problems such as low rotational freedom, to achieve the effect of improving the quality of construction, ensuring safety, and ensuring the quality of installation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0024] Next, the tunnel pipe shed construction method and device of the present invention will be described in detail with reference to the accompanying drawings.
[0025] First of all, in order to speed up the construction progress, it is necessary to ascertain the geological conditions in advance, measure the buried depth and other issues, and then figure 1 As shown, in step S1, the pipe shed opening contour line is determined on the working face of the tunnel to be constructed, and 27 hole positions are marked on the pipe shed opening contour line, and the 27 hole positions are divided into nine A Hole position, nine B hole positions and nine C hole positions, the A hole position is distributed in the middle and upper part of the opening contour line of the pipe shed and forms the A hole position area, and the B hole position is distributed in the lower left part of the pipe shed opening contour line And form the hole position area B, the hole position C is distributed in t...