A multi-skill personnel scheduling method in a research and development project combination

A technology for personnel scheduling and projects, which is applied in the field of multi-skilled personnel scheduling in R&D project portfolios, and can solve problems such as the complexity and difficulty of multi-skilled personnel scheduling decisions

Inactive Publication Date: 2019-04-16
HEFEI NORMAL UNIV
View PDF0 Cites 15 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] A method for scheduling multi-skilled personnel in a R&D project combination proposed by the present invention can solv

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A multi-skill personnel scheduling method in a research and development project combination
  • A multi-skill personnel scheduling method in a research and development project combination
  • A multi-skill personnel scheduling method in a research and development project combination

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0154] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments It is a part of embodiments of the present invention, but not all embodiments.

[0155]In this embodiment, a multi-objective ant colony algorithm for the multi-skilled personnel scheduling problem in a R&D project portfolio is characterized in that it is applied to an IT product development project portfolio consisting of multiple projects, and m projects need to be completed. There are n employees to choose from, and each employee has at least one skill, and there are s types of skills required by the project portfolio. According to the decision-making objectives of the enterprise, the personnel scheduling optimization decision ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

According to the multi-skill personnel scheduling method in the research and development project combination, which can solve the technical problems that a multi-skill personnel scheduling decision inthe research and development project combination is high in complexity and high in difficulty. The method mainly comprises the steps of generating an initial scheme of multi-skill personnel scheduling in a project combination according to a traditional serial progress production mechanism; Establishing a project combination multi-skill personnel multi-target scheduling model by considering the learning effect of personnel; When a learning effect and a plurality of scheduling targets are considered, applying a multi-target improved ant colony algorithm to iteratively solve the multi-skill multi-target scheduling model to obtain a Pareto solution set; And for the Pareto solution set, solving an optimal solution of the model by adopting an approximate ideal solution sorting method, and taking the optimal solution as a personnel configuration scheme for the project combination multi-skill personnel multi-target scheduling problem. On the basis of considering the cost and the constructionperiod of a traditional project personnel scheduling model, the personnel learning effect is further considered, the personnel skill training decision-making target is increased, rapid solving of themodel is achieved, and the decision-making requirements of enterprise managers are met.

Description

technical field [0001] The invention relates to the technical field of method optimization, in particular to a method for scheduling multi-skilled personnel in a research and development project combination. Background technique [0002] The IT industry is a high-tech industry formed with the development of science and technology, including high-tech companies such as software, hardware, network, and e-commerce. For high-tech industries, IT product development capabilities reflect the core competitiveness of companies in the industry, and IT product development activities are the company's main production activities. With the rapid development of science and technology, the structure and function of IT products are becoming more and more complex. To successfully develop an IT product, it is usually necessary to organize complex activities into multiple projects for more convenient and effective management. Thus, a collection of multiple development projects with a unified ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G06Q10/06G06Q10/10
CPCG06Q10/06311G06Q10/103
Inventor 陈蓉梁昌勇顾东晓赵惠民
Owner HEFEI NORMAL UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products