Construction Method of Upside-Down Diaphragm Wall
An underground continuous wall and construction method technology, applied in sheet pile wall, infrastructure engineering, construction and other directions, can solve the problems of poor waterproof effect, long construction period, high construction risk, etc., to ensure construction safety, reduce labor intensity, Good quality control effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0026] The embodiments of the present invention will be described in detail below with reference to the accompanying drawings, but the present invention can be implemented in many different ways defined and covered by the claims.
[0027] refer to figure 1 and figure 2 , the preferred embodiment of the present invention provides a kind of reverse underground diaphragm wall construction method, comprises the following steps:
[0028] S1: The upper outer wall 10 of the ground connecting wall is constructed on the diaphragm wall soil by using the manual excavation reverse method.
[0029] S2: Use the grooving machine 40 to form a groove on the layer 30 at the upper outer wall 10 of the ground connecting wall to form a groove for forming the lower wall of the ground connecting wall, and the groove is located on the inner side of the upper outer wall 10 of the ground connecting wall .
[0030] S3: The lower part of the ground connection wall is formed by casting in the trench. ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com