Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Multi-rope friction hoist head sheave filler block replacing method

A friction hoist and replacement method technology, applied in the direction of lifting equipment, transportation and packaging in the mine, can solve the problems of uneven wear of the lining block, high labor intensity of workers, error in running diameter, etc., and reduce the contact area. , Disassembly and installation to save time and effort, and the effect of adjusting the turning position

Active Publication Date: 2019-05-21
SHANDONG GOLD MINING LINGLONG
View PDF10 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] Due to the intensive lifting task of the new shaft, the lining block of the sky wheel has been used for a long time, and the lining block wears seriously after a long period of time, and the wear degree of the lining block of the four wheel sets of the sky wheel is different, and the running diameter has an error, so the lining block must be replaced , The disassembly of the old lining block in the replacement process of the lining block is the link that takes the longest time and has the greatest labor intensity in the whole process. In the prior art, two methods are generally used to replace the lining block: the first method is: use hoisting The cage and the counterweight make the first rope loose and detached from the sky wheel, and then use various shapes of crowbars and sledgehammers to manually remove and replace the lining block. This replacement method has a high risk factor and high labor intensity. During the installation process, glue is used for installation, and it is quite difficult to disassemble. According to past experience, the entire lining block replacement process takes more than 60 hours.
The second replacement method is: in order to save the time of disassembling the lining block, the spare sky wheel is replaced as a whole, and the old lining block sky wheel is returned to the factory for replacement. very high

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Multi-rope friction hoist head sheave filler block replacing method
  • Multi-rope friction hoist head sheave filler block replacing method
  • Multi-rope friction hoist head sheave filler block replacing method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0042] The present invention will be described in detail below in conjunction with the accompanying drawings and embodiments.

[0043] 1. Preliminary preparation

[0044] 1. Freeze and shrink the new lining block in the freezer before overhaul, and transport the frozen and shrunk new lining block to the sky wheel in advance in an incubator for standby. The insulated box keeps the new liner warm to prevent thermal expansion of the new liner. After measuring the shrinkage of the new liner, the new liner shrinks by 0.25 mm, and the liner after cold shrinkage is easy to install.

[0045] 2. All materials and spare parts are ready and in place ahead of time.

[0046] 2.1. Prepare the following tools and materials

[0047] name

Specification

quantity

use

Remark

flat shovel

25cm

6 sticks

Remove pads

sledgehammer

4

Removing and installing pads

Hand drill

2

Remove pads

live wrench

...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a multi-rope friction hoist head sheave filler block replacing method. The method comprises the steps of head rope pressing, used filler block destructive damaging, used filler block detaching, and new filler block installation, so that head sheave filler blocks are replaced. Filler blocks of two head sheaves are detached and installed at the same time, and overhaul time of the filler blocks of the head sheaves is shortened on the whole. A sixteen-hole plate is used for rope locking to be matched with stretching and retraction of a rope adjusting oil cylinder to enablethe head rope to be loosened and disengaged from the head sheaves, hoisting for a tank cage and a balance hammer is avoided, and overhaul safety coefficients are greatly increased. A turning device is adopted for destructively turning used filler blocks of four head sheaves, the used filler blocks are extremely easy to detach after being turned, the difficulty brought by forced damage and detaching carried out by a hammer and a flat spade adopted manually in the prior art is lowered, the labor intensity is lowered, and the potential safety hazards brought when multiple workers stand on the head sheaves to manually detach the used filler blocks are avoided.

Description

technical field [0001] The invention provides a method for replacing the lining block of a sky wheel, and in particular relates to a method for replacing the lining block of a multi-rope friction hoist. Background technique [0002] Multi-rope friction hoists are widely used in mine hoisting equipment. With the gradual increase of production tasks, the wear and tear of various parts of the hoist gradually increases during use. Whether the hoist operates safely and effectively will directly affect the completion of production tasks. The daily maintenance of the hoist will require us to complete the maintenance task in a timely, efficient and fast manner. The new shaft of Linglong Gold Mine Lingshan mining area adopts a multi-rope (four ropes and two tails) friction hoist for hoisting, with a lifting height of 960.5 meters. The layer cage and the counterweight are mutually balanced and lifted, and are mainly composed of drums, electric control equipment, reducers, motors, wire...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): B66B19/00
Inventor 赵海杰王世国赵海彬赵广义赵金强张雪楣所爱军
Owner SHANDONG GOLD MINING LINGLONG
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products