A quality tracking system and method based on a BIM model
A model and quality technology, applied in the fields of instruments, induction record carriers, data processing applications, etc., can solve problems such as difficulty in accurately matching concrete test blocks and concrete pouring parts, and inability to achieve concrete test block test report information and other problems
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0051] This embodiment provides a quality tracking method based on the BIM model. The main idea is to make the concrete pouring situation of each truck accurately reflected in the BIM model in a timely and accurate manner, and to view the area's status in the properties of the BIM model. Concrete information corresponding to concrete and concrete test block detection report information, so as to realize the whole process of concrete quality tracking based on the BIM model, and also facilitate the timely and vivid display of the progress of concrete pouring.
[0052] Referring to 1, the quality tracking method based on the BIM model includes the following steps:
[0053] S1. The concrete supplier prepares concrete according to the demand information of the concrete buyer, and writes the vehicle transportation information 920 in the first electronic tag 10 carried by the concrete transportation vehicle 1; associates the concrete information 910 with the vehicle transportation inf...
Embodiment 2
[0086] This embodiment provides a quality tracking system based on the BIM model, the following in conjunction with the attached figure 1 Describe the system further. The quality tracking system includes:
[0087] The first electronic label 10 is arranged on the concrete transport vehicle 1 and records the information of the transport vehicle;
[0088] The second electronic label 20 is set in the concrete test block 2, and records the test block information 930;
[0089] The third electronic label 30 is arranged on the concrete pump truck 3, and records the pump truck information 940 and the positioning chip information 950;
[0090] Electronic tag reader one 51 is arranged on the concrete pump truck 3, and is used to identify the information in the first electronic tag 10, the second electronic tag 20, and the information in the third electronic tag 30, and is used to record the concrete pouring start time and end time, and transmit the identified first electronic tag 10, ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com



