A Construction Method for Expansion of Existing Expressway Rectangular Culvert
A technology for highways and construction methods, applied in construction, artificial islands, water conservancy projects, etc., can solve problems such as increasing the difficulty of traffic organization, affecting construction progress, and affecting the passage of existing expressways
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0055] A construction method for extending an existing rectangular culvert of an expressway, comprising the following steps:
[0056] First, remove the original culvert pavement layer 15 of the original culvert, and level the foundation exposed after the removal of the original culvert pavement layer 15. The original culvert pavement layer 15 is as follows: figure 1 shown.
[0057] Second, within the linear extension range of the original culvert 1, excavate and level the foundation of the widened section, such as figure 2 , image 3 and Figure 4 As shown, the digging depth at the middle of the widening section is P, and the digging depth at the end of the widening section is Q. The end mentioned here refers to the end of the widened section away from the first section of the original culvert, ie excluding the end of the widened section connected to the first section of the original culvert.
[0058] Preferably, the digging depth P at the middle of the widened section is...