Electric power engineering project review system

A power engineering and project technology, applied in the field of power engineering project review systems, can solve problems such as irregular business processes, difficult review progress control, and low level of informatization, so as to improve review efficiency and quality and ensure traceability. Effect

Inactive Publication Date: 2019-06-07
中国大唐集团科学技术研究总院有限公司
View PDF4 Cites 18 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] The technical and economic internal review of electric power engineering is an important part of the cost management of enterprise construction projects. Due to the large number of participants, low level of informatization, lack of effective restraint mechanism, and non-standard business processes, the traditional internal audit work of technical and economic enterprises often has unclear responsibilities, Problems such as incomplete information, incomplete content, and insufficient benchmarking data lead to high communication costs, low review efficiency, and difficulty in review progress control, which is not conducive to maintaining the seriousness and rigor of the review work, and poses a greater risk of compliance and internal control. Especially in the face of a considerable number of technical and economic review work requirements for power engineering construction projects

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Electric power engineering project review system
  • Electric power engineering project review system
  • Electric power engineering project review system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0050] The evaluation system of electric power engineering project in this embodiment-Taking the evaluation management of bidding documents as an example

[0051] The selection authority of the review project corresponding to the default user's login account and the review authority of the project to be reviewed;

[0052] Verify the user's login account and password, and the user sends a review request by entering the project business information and review documents related to the project to be reviewed through the selected project to be reviewed;

[0053] Judging whether the project business information meets the content standards, and judging whether the file format and file content of the review file conform to the predetermined file format; if so, allowing the project business information and review files to be saved to the pending review In the database; if not, feedback whether the file format or file content of the review file conforms to the predetermined file format;...

Embodiment 2

[0114] The power engineering project review system in this embodiment, on the basis of Embodiment 1, also includes a review and statistics function. The system counts construction project feasibility study estimates, initial budget estimates, adjustment estimates, bidding documents, execution estimates, and design changes through query conditions. , Contract Settlement, Project Total Settlement, the number of reviews for custom reviews, and display review progress; among them, query conditions include project company, construction nature, project region, project status, approval date, project classification, and construction project.

[0115] It also includes the multi-project investment benchmarking management function. The system counts the application amount and the approved amount of the review documents through the query conditions, calculates the review increase and decrease amount and the review increase and decrease rate, and the analysis results are output and applied i...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to an engineering project review system, and belongs to the technical and economic review management research field of the whole process of an electric power engineering construction project. The system is composed of a user layer, an application layer, a platform layer and a data layer, and comprises a work task module, a project review module and a system management module.The work task module is mainly used for displaying an automatic push message reminder for reviewing a work state of a project in the system. The project review module is used for realizing scientificdecision making, investment control and online review evaluation of benchmarking management of each stage of electric power engineering project construction. The system management module is used forsystem flow design, monitoring, historical data management and the like. The system solves the problems of unclear review work flow, unknown responsibility, data loss, incomplete content, insufficientmanagement benchmarking data and the like in the construction process of the electric power engineering project, realizes standardized, normalized and informationized management of project review work, improves the work quality and efficiency, and promotes improvement of the fine management level of engineering project construction.

Description

technical field [0001] The invention belongs to the field of engineering project review, and in particular relates to a power engineering project review system. Background technique [0002] The technical and economic internal review of electric power engineering is an important part of the cost management of enterprise construction projects. Due to the large number of participants, low level of informatization, lack of effective restraint mechanism, and non-standard business processes, the traditional internal audit work of technical and economic enterprises often has unclear responsibilities, Problems such as incomplete information, incomplete content, and insufficient benchmarking data lead to high communication costs, low review efficiency, and difficulty in review progress control, which is not conducive to maintaining the seriousness and rigor of the review work, and poses a greater risk of compliance and internal control. Especially in the face of a considerable numbe...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06G06Q10/10G06Q50/06
Inventor 王洪玲吴凤洁陈正浩孟金林姜东红聂永武玉刘端媚喻涛靳华
Owner 中国大唐集团科学技术研究总院有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products