Suppression method of urban rail transit power supply current spike based on temporary speed limit in section

A technology for urban rail transit and temporary speed limitation, applied in collectors, electric vehicles, electric traction, etc., can solve problems such as increasing equipment heat generation, component aging, and reducing component sensitivity, so as to suppress power supply current peaks and prevent tripping accidents , the effect of reducing peak pressure

Active Publication Date: 2021-05-07
NANJING UNIV OF SCI & TECH
View PDF3 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, the above scheme has the following problems: (1) Excessively increasing the set current range of the DC cabinet will increase the heat generated by the equipment, reduce the sensitivity of the components, cause the components to age, and increase the safety hazard of the power supply system; (2) Properly extend the filtering of the high-speed circuit breaker The time will violate the protection essence of high-speed circuit breakers, and the filtering time is difficult to determine; (3) The transformation of high-speed circuit breakers involves more substation equipment, which increases the difficulty of implementation and the expected cost

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Suppression method of urban rail transit power supply current spike based on temporary speed limit in section
  • Suppression method of urban rail transit power supply current spike based on temporary speed limit in section
  • Suppression method of urban rail transit power supply current spike based on temporary speed limit in section

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0077] Now take a power supply partition of a certain subway line as an example. The power supply partition includes 4 stations, three sections, and two traction substations. The steps for setting the temporary speed limit in the section are as follows:

[0078] Step 1. Establishing a model of the train traction power supply system, including establishing a train model, a substation model, a catenary model and a backflow network model.

[0079] Step 2. Establishing an operation data module, including a train data module, a substation data module and a line data module.

[0080] Step 3. Establish a train operating characteristic module that does not set a temporary speed limit in the section, and provide the dynamic relationship between the running time, power, position and pantograph current of the train section, as follows:

[0081] Step 3.1, download the data of .evr type from the event recorder EVR in the vehicle control unit VCU, and the sampling period is 50ms;

[0082]...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a method for suppressing power supply current spikes of urban rail transit based on interval temporary speed limit. The method is as follows: establish a train traction power supply system model, including a train model, a substation model, a catenary model, and a return network model; establish an operation data module, including a train data module, a substation data module, and a line data module; Speed ​​train operation characteristics module; establish a train operation characteristics module with temporary speed limit in the interval, including judging whether to limit the speed according to the peak value of the allowable power supply current, setting a speed limit mode that matches the peak value of the power supply current; traversing all time to get the temporary limit The current of the substation feeder cabinet under the speed mode is compared with the current of the substation feeder cabinet without the temporary speed limit mode to test the effect of the temporary speed limit on suppressing the peak of the supply current. The invention can suppress the peak value of the power supply current, prevent tripping accidents, and has the advantages of high feasibility, low cost and strong adjustability.

Description

technical field [0001] The invention relates to the technical field of urban rail transit, in particular to a method for suppressing power supply current spikes of urban rail transit based on inter-section temporary speed limit. Background technique [0002] Urban rail transit power supply system is the power source of urban rail transit operation, responsible for the supply and transportation of electric energy, providing power for train operation and power and lighting power for stations, sections, depots, control centers and other buildings. The power supply system should have high security and reliability to ensure power consumption. In the actual operation of the line, due to the excessive traffic density, excessive passenger capacity, emergency repairs and other harsh working conditions on the line, frequent voltage shocks and current shocks will occur in the traction step-down hybrid substation, resulting in peak power supply current and high-speed circuit breaks The...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Patents(China)
IPC IPC(8): B61L27/04B60L9/00B60L5/18B60M1/13
Inventor 胡文斌陈威哈进兵吕建国孙天骁
Owner NANJING UNIV OF SCI & TECH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products