A construction method of stone smoke exhaust duct exiting the roof hood
A construction method and flue gas technology, applied in the direction of vertical pipes, buildings, building components, etc., can solve the problems of long construction period, prone to quality problems, and high operating requirements for construction personnel, and achieve short construction period, fast construction, and reduced Effects of noise and dust pollution
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0028] The present invention will be described in further detail below in combination with specific embodiments.
[0029] In the description of the present invention, it should be noted that the orientations or positional relationships indicated by the terms "center", "upper", "lower", "vertical", "horizontal" etc. are based on the orientations or positions shown in the drawings The relationship is only for the convenience of describing the present invention and simplifying the description, but does not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and thus should not be construed as a limitation of the present invention. .
[0030] In the description of the present invention, it should be noted that unless otherwise specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection or a de...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 