A technology of high ground stress and combined support, which is applied in tunnels, tunnel linings, underground chambers, etc., can solve problems such as excessive stress and simple strong support, and achieve the purpose of maintaining support, avoiding failure, and obviously economical benefit effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0030] The floor part width h=890cm of the high geostress soft rock tunnel, the arch wall part height l=720cm;
[0031] The yield anchors are driven into the arch wall part and the roof part of the high-geostress soft rock tunnel, and each yield anchor is divided into several groups, and the yield anchors of each group are located on a vertical section of the high-geostress soft rock tunnel, and It is distributed radially; in each group of yield anchors, the distance between the ends of two adjacent yield anchors located on the arch wall is 1-2m; the horizontal distance between two adjacent yield anchors is 1-2m ;The length of the anchor bolt is 4~5m;
[0032] The pressure relief groove is dug out in the arch wall part of the high ground stress soft rock tunnel, and the pressure relief groove is located between two adjacent yield bolts in each group of yield bolts; the height of the pressure relief groove from the floor part is 4m;
[0033] Crush and grind waste tires into ru...
Embodiment 2
[0038] Method is with embodiment 1, and difference is:
[0039] (1) The floor portion width h=850cm of the high geostress soft rock tunnel, and the arch wall portion height l=750cm;
[0040] (2) The height of each pressure relief groove from the bottom plate is 3m;
[0041] (3) In the concrete containing rubber powder, the rubber powder shall replace the fine sand according to the mixing amount of 15%;
[0042] (4) Concrete spray thickness 20cm containing rubber powder;
[0043] (5) The thickness of concrete with strength C25 is 28cm; the grid horizontal spacing of double-layer steel mesh is 1cm, and the vertical spacing is 15cm; the thickness of secondary masonry is 40cm.
[0044] Example 2
[0045] Method is with embodiment 1, and difference is:
[0046] (1) The floor portion width h=950cm of the high geostress soft rock tunnel, and the arch wall portion height l=700cm;
[0047] (2) The height of each pressure relief groove from the bottom plate is 5m;
[0048] (3) In ...
PUM
| Property | Measurement | Unit |
|---|---|---|
| Width | aaaaa | aaaaa |
| Height | aaaaa | aaaaa |
| Length | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 