A technology for virtual power plants and network constraints, which is applied to AC network circuits, electrical components, circuit devices, etc. It can solve the problems of transmission line transmission congestion, affecting market clearing results, and large scale, so as to simplify the modeling process and reduce calculations. Workload, the effect of increasing profits
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0101] In order to better understand the present invention, the present invention will be further described below in conjunction with accompanying drawing and specific embodiment:
[0102] Such as figure 1 As shown, a method for constructing a virtual power plant double-layer optimization model considering network constraints, the virtual power plant double-layer optimization model includes an upper layer virtual power plant profit maximization model, and a lower layer market clearing model considering network constraints; specifically includes the following steps :
[0103] S1: Establish the profit maximization model of the upper virtual power plant; the specific steps are as follows:
[0104] S11: If figure 2 As shown, the upper-level problem is that the virtual power plant operator optimizes its bidding power and bidding price according to the historical market clearing information, with the goal of maximizing profit. The specific optimization goal is the revenue minus t...