A prestressed light pile and construction method for quickly anchoring emergency bridge cables
A prestressed, light-weight technology, applied in the field of geotechnical engineering, can solve the problems of increasing the amount of work, prolonging the construction schedule, and self-heavy steel pipe piles, reducing transportation costs, improving the uplift bearing capacity, and increasing the uplift bearing capacity. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0026] The specific embodiments of the present invention will be described in detail below with reference to the accompanying drawings.
[0027] Such as figure 1 with figure 2 As shown, the pre-stressed light pile for quickly anchoring emergency bridge cables according to the present invention includes a hollow pile body 10 and a pile cap 20 arranged at the upper end of the pile body 10 and the pile body in an interference fit.
[0028] The pile body 10 is composed of three layers, from the outer layer to the inner layer, the outer tube 101, the middle tube 102, and the inner tube 103, respectively. The outer tube 101, the middle tube 102, and the inner tube 103 are coaxially arranged. The diameter is equal to the inner diameter of the outer tube 101, and the outer diameter of the inner tube 103 is larger than the inner diameter of the middle tube, so as to realize the interference fit between the inner tube and the middle tube.
[0029] The outer tube 101 is a hollow aluminum alloy...