Construction method of super-large section tunnel in fork and intersection section

A technology of super large section and construction method, applied in tunnels, tunnel linings, earthwork drilling, etc., can solve problems such as lack of construction experience

Active Publication Date: 2019-09-20
THE FOURTH CONSTR OF YUNNAN ARCHITECTURAL ENG GROUP
View PDF15 Cites 11 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The construction of this part is currently in the discussion stage in the world. There are no relevant construction methods, specifications and regulations, and there is no mature construction experience for reference.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method of super-large section tunnel in fork and intersection section
  • Construction method of super-large section tunnel in fork and intersection section
  • Construction method of super-large section tunnel in fork and intersection section

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0055] Please refer to figure 1 , the present embodiment relates to a super-large-section tunnel in the bifurcation intersection section, which is a super-large-section tunnel formed by the convergence of the main tunnel 111 and the branch tunnel 112 . The feeder tunnel 110 includes a main tunnel 111 and a branch tunnel 112, and the main lane 120 includes 5 lanes 121 and 4 lanes 122. The 5 lanes 121 is a super-large section with a large section and a high tunnel height. Many, the construction process is complicated, and the branch line tunnel 110 extends to the main roadway 120 during construction.

[0056] The present invention provides a construction method for a super-large-section tunnel in a bifurcation intersection section, which can effectively solve the construction problem of the above-mentioned highway engineering tunnel underground intercommunication bifurcation tunnel intersection section, which includes the following steps:

[0057] Step S1: Please refer to fig...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a construction method for a super-large section tunnel in a fork and intersection section, and relates to the technical field of construction in tunnel engineering. The construction method of the super-large section tunnel in the fork and intersection section includes the steps that a longitudinal construction area is planned; a second lining construction area is planned; a left part is excavated in the first excavation direction; a right part is excavated in the first excavation direction; a middle part is laterally excavated; the middle part area is excavated in the reverse direction to a fork site; a side wall of the right part is excavated in the direction of the first excavation direction; the remaining part of a tunnel face of the middle part is constructed in the first excavation direction; when an initial support is constructed in the rear part area, pouring of the last second lining of a branch tunnel and a main tunnel is completed, then a plug end wall is poured, and a second lining trolley is assembled in a front part area and the second lining is constructed until the construction is completed. The construction method of the super-large section tunnel in the fork and intersection section solves the construction problem of a 'big belly' section, provides on-the-spot basis for modifying, supplementing and perfecting the editing and revision of specifications and regulations and the industry standards, and a way of thinking is provided for speeding up the research in the aspect.

Description

technical field [0001] The invention relates to the technical field of construction in tunnel engineering, in particular to a construction method for a super-large-section tunnel at a bifurcation intersection section. Background technique [0002] The underground intercommunication of the highway project is a tunnel. At the intersection of the two tunnels, there are 5 lanes (meeting section), which is a super-large section. The meeting lane is generally designed to be 70 meters long, and then becomes 4 lanes. It belongs to a structure with small sides and a large middle . Its characteristics are: small clear distance at the intersection of the branch tunnel and the main tunnel, no intermediate guide double arch, large difference in tunnel height with variable section, and large variation in tunnel section. The difficulty is: (1) The intersection is a multi-arch without intermediate guide, and the tunnel height varies greatly, which is the weakest construction site, especial...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More