A construction method and technology of inverted rainbow wells, which are applied in excavation, water conservancy projects, water conservancy engineering equipment and other directions, can solve problems such as affecting construction, low construction efficiency, deformation of concrete structures, etc., to improve construction quality, work efficiency, and project cost. reduced effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0041] Various embodiments of the invention will be described in more detail below with reference to the accompanying drawings. In the various drawings, the same elements are denoted by the same or similar reference numerals. For the sake of clarity, various parts in the drawings have not been drawn to scale.
[0042] Such as Figure 1 to Figure 5 As shown, the present invention provides a construction method for inverted rainbow well, which includes the following multiple steps.
[0043] Step 1: In the early stage of construction, two inverted rainbow shaft prefabricated parts 1 and the middle river-crossing pipeline prefabricated structure 2 are made, and the inverted rainbow well foundation pit 3 and the middle river-crossing pipeline foundation pit 4 are excavated;
[0044] In this step, preparations are made for the later construction work, wherein, the step of making two inverted rainbow shaft prefabricated parts 1 and the intermediate river-crossing pipeline prefabric...