Advanced drilling system based on optimal theoretical hole arrangement scheme and working method
A technology of advanced drilling and hole layout, which is applied in the direction of earthwork drilling, mining equipment, tunnels, etc., and can solve the problems of heavy tool load, low speed of shield tunneling and TBM excavation, and easy failure and damage of shield tunneling tunnel and TBM equipment, etc. question
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0108] Steps 1 to 6 complete the process of statistically calculating from the test data and determining the optimal theoretical hole layout scheme in the tunnel section according to the actual situation on site.
[0109] Steps 7 to 11 are the transformation of the existing parts of the shield machine in the advanced drilling system and the design and installation method of the working system of the advanced drilling rig. The existing parts of the shield machine after transformation and the working system of the advanced drilling rig form the advanced drilling system.
[0110] Step 12 to step 18 are the workflow of the advanced drilling system.
[0111] The specific description is as follows:
[0112] step one
[0113] Determine the formation information of the tunnel face within the excavation range of the shield machine.
[0114] According to the on-site sampling results, determine the face type of the shield machine, that is, the stratum information of the excavation cro...