Unlock instant, AI-driven research and patent intelligence for your innovation.

Method for improving construction efficiency of full-rotation bridge girder erecting machine

A technology of construction efficiency and bridge erecting machine, which is applied in the direction of erecting/assembling bridges, bridges, bridge construction, etc. It can solve the problems of cumbersome steps, increase construction risks, and restrict the construction period of bridge deck erection, so as to improve construction efficiency and reduce high-altitude operations Time and the effect of reducing construction risks

Active Publication Date: 2019-10-25
CHINA RAILWAY MAJOR BRIDGE ENG GRP CO LTD +2
View PDF7 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] The disadvantage of the conventional method is that: there are many types of internode lengths of steel girders, and beams of different spans are connected to each other. As a result, when the bridge erecting machine is running, the track beam cannot be moved in place at one time, and it needs to be moved forward alternately with the bridge erecting machine multiple times. The design position and steps are cumbersome, which restricts the construction period of the bridge deck erection and increases the construction risk

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method for improving construction efficiency of full-rotation bridge girder erecting machine
  • Method for improving construction efficiency of full-rotation bridge girder erecting machine
  • Method for improving construction efficiency of full-rotation bridge girder erecting machine

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0026] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments It is a part of embodiments of the present invention, but not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

[0027] A method for improving the construction efficiency of a full-turn bridge erecting machine, combining figure 1 , figure 2 and image 3 , including the following steps:

[0028] Ⅰ. Set up four transverse distribution beams 1 on the steel beams and anchor them on the chords of the steel beams 2;

[0029] Ⅱ. On the horizontal distribu...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a method for improving the construction efficiency of a full-rotation bridge girder erecting machine. The method comprises the following steps that 1, four transverse distribution beams are arranged on a steel beam, and the transverse distribution beams are fixed on a steel beam chord; 2, a track beam is longitudinally arranged on the transverse distribution beams along the bridge, and the track beam can longitudinally move along a bridge on the transverse distribution beams; 3, the bridge girder erecting machine is installed in place, and is supported on the first distribution beam and the second distribution beam, and erection construction is performed on a section bridge panel; 4, after the section bridge panel is erected, the bridge girder erecting machine moves forwards along the track beam and is supported on the third distributing beam and the fourth distributing beam, the track beam is forwards moved, and meanwhile, the first distributing beam and the second distributing beam are hoisted to the corresponding position of the next section through the bridge girder erecting machine; and 5, the step 4 and the step 5 are repeated, and rest bridge deck panels are continuously erected. The method has the advantages that the problem that the bridge girder erecting machine cannot walk in place at one time at different steel beam joints and different spansteel beams can be solved, the construction work efficiency is improved, the aerial work time is shortened, and the construction risk is reduced.

Description

technical field [0001] The invention relates to the field of bridge deck system construction, in particular to a method for improving the construction efficiency of a full-turn bridge erecting machine. Background technique [0002] The Pingtan Strait Road-Railway Bridge is the first cross-strait road-railway bridge in my country. The Strait Bridge is different from the Bay Bridge built in the past. Its construction faces harsh conditions such as strong winds, high waves, surges, strong typhoons, and complex geology. The construction of the bridge brought great challenges and high risks. This bridge is the first attempt in the field of cross-strait bridges in China. Whether it is the harshness of the environment, or the technical challenges and construction risks it faces, it is far superior to other cross-sea bridges that have been built or are under construction in China. The Pingtan Strait Highway-Railway Bridge is the first time in the world to build a Strait Bridge in ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E01D21/00
CPCE01D21/00
Inventor 卢炜程细平赵炜夏熹微陈望孙国光王晓亮陈文盛王锐妥鹏安浩兵赵进文吴汉湘钱玉山李鑫廖远龚金才
Owner CHINA RAILWAY MAJOR BRIDGE ENG GRP CO LTD