Prefabricated platform and installation method thereof
An installation method and a platform technology, which are applied in shaft equipment, earthwork drilling, wellbore lining, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0034] The specific implementation manner of the present invention will be described in more detail below with reference to schematic diagrams. The advantages and features of the present invention will be more apparent from the following description. It should be noted that all the drawings are in a very simplified form and use imprecise scales, and are only used to facilitate and clearly assist the purpose of illustrating the embodiments of the present invention.
[0035] Such as figure 1 , figure 2 and image 3 As shown, this embodiment provides a prefabricated platform 1 for forming a transportation channel on a segment at the bottom of a shield tunnel, including a bearing body 10 and several reserved cast-in-place grooves 12 arranged in the bearing body 10 , the reserved cast-in-place groove 12 extends from the surface of the bearing body 10 into the bearing body 10, and the maximum vertical height h of the prefabricated platform 1 is less than or equal to the maximum ...