Power generation and scheduling grading peak regulation method for cascade hydropower station
A hydropower station, cascade technology, applied in the direction of data processing applications, instruments, calculations, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0089] This embodiment is an application of joint power generation scheduling of cascade hydropower stations composed of upstream hydropower station X and downstream anti-regulation power station Y in a certain river basin. This method also has guiding significance for joint power generation scheduling and short-term peak-shaving operation of cascade hydropower stations in other river basins. The upstream X hydropower station has strong storage capacity adjustment ability, annual adjustment ability, and large installed capacity. The downstream Y hydropower station is located about 10km below the X hydropower station and is a run-of-the-river power station. The total installed capacity of the X-Y cascade hydropower stations reaches 550MW. Since the X hydropower station is mainly responsible for peak regulation, frequency regulation and emergency backup in the system, the Y hydropower station acts as a downstream anti-regulation cascade, which can adjust the discharge flow of the ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 