Thread rolling equipment for parts processing
A technology of parts processing and equipment, which is applied in the field of thread rolling equipment for parts processing, can solve the problems of low screw processing efficiency, achieve the effects of improving efficiency, avoiding transfer work, and reducing workload
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0040] This embodiment is basically as figure 1 , figure 2 and image 3 Shown: thread rolling equipment for parts processing, including frame 1, first vibrating plate automatic feeder 2, thread rolling mechanism and cushion threading mechanism, first vibrating plate automatic feeder 2 includes first sorting discharge chute 3 , the screws 37 in the first sorting discharge chute 3 all have their heads down and their stems up.
[0041] The frame 1 is fixedly connected with a round table 4, and the round table 4 is rotatably connected with a turntable 5. Specifically, the inside of the round table 4 is provided with a cavity 6, and a motor 7 is installed in the cavity 6, and the output end of the motor 7 is fixedly connected with the same axis. A rotating shaft 8 is arranged, and the rotating shaft 8 runs through the round table 4 and is fixedly connected with the turntable 5. The rotating shaft 8 runs through the round table 4 and is coaxially connected with a bearing 9, and t...
Embodiment 2
[0056] The difference between this embodiment and Embodiment 1 is that: Figure 4 As shown, the pad threading mechanism also includes a second vibrating plate automatic feeder 27, the second vibrating plate feeder includes a second sorting discharge chute 28, and the second sorting discharge chute 28 is far away from the second vibrating plate feeder. One end is connected with the vertical chute 24, and the second sorting discharge chute 28 guides the gasket 38 into the vertical chute.
[0057] In this embodiment, the second vibrating plate automatic feeder 27 is used to screen and arrange the gaskets, and the gaskets enter the second sorting discharge chute 28. At this time, the gaskets in the second sorting discharge chute 28 are arranged vertically, and the gaskets do not overlap. The gaskets in the second sorting discharge chute 28 can enter in the vertical chute in an orderly manner, and the gaskets are arranged vertically in a single row in the vertical chute, preventing...
Embodiment 3
[0059] The difference between this embodiment and Embodiment 1 is that: Figure 5 and Figure 6 As shown, a notch is opened at the bottom of the second vertical protruding strip 23 , mounting holes are opened on both side walls of the notch, and a through hole is opened at the top of the blocking piece 26 . The bottom end of the first vertical protruding bar 22 is provided with a magnet 29 , specifically, the bottom end of the first vertical protruding bar 22 is provided with a placement slot, and the magnet 29 is bonded in the placement slot.
[0060]The worker aligns the through hole of the blocking piece 26 with the installation hole of the notch, and inserts the pin shaft 30 into the installation hole and the through hole to realize the rotational connection between the blocking piece 26 and the second vertical raised strip 23, and the worker can disassemble the blocking piece 26 , to realize the detachable installation of the blocking plate 26 . When the washer is a met...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


