Water-stopping method at joint between occlusal pile and ground connecting wall

A technology of occlusal pile and ground connection wall, applied in the field of construction engineering, can solve problems such as difficulty in plugging work, affecting the safety of foundation pit and surrounding environment, etc. Effect

Inactive Publication Date: 2021-10-08
THE FOURTH ENG CO LTD OF CHINA RAILWAYNO 20 BUREAU GRP +1
View PDF9 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, the problem of water-stopping at the joints between the occlusal piles and the underground diaphragm wall is a major and difficult point. Once water leakage occurs at the joints between the occlusal piles and the underground diaphragm wall, not only is it very difficult to stop the leakage, but it will also affect the foundation pit and the surrounding environment safety
At present, there is no effective system construction method

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Water-stopping method at joint between occlusal pile and ground connecting wall
  • Water-stopping method at joint between occlusal pile and ground connecting wall

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0032]The main structure of the water-stop structure at the joint between the occlusal pile and the ground connection wall in this embodiment includes the ground connection wall 1, the occlusion pile 2, the occlusion pile 3, the rotary spray pile 4, the steel flower pipe 5 and the grouting pipe 6. The occlusal piles and the occlusal piles 3 and the occlusal piles 2 are arranged at intervals, interlocking to form an occlusal pile, the ground connection wall 1 is occluded with the adjacent occlusal pile 2, and the buried depth of the underground diaphragm wall 1 is the same as that of the adjacent occlusal pile 2. The burial depth is the same; the steel flower tube 5 is welded on the reinforcement cage on the adjacent side of the ground connection wall 1 and the adjacent occlusal pile 2, and the burial depth is the same as that of the ground connection wall 1; the grouting pipe 6 is buried in the occlusion pile 2 and the ground connection wall 1 outside the joint, the buried dept...

Embodiment 2

[0035] In this embodiment, the water-stopping structure at the joint between the occlusal pile and the ground wall described in Example 1 is applied to the joint between the occlusal pile and the underground diaphragm wall in a certain subway station, and the water-stop at the joint between the occlusal pile and the ground wall The main structure of the structure includes the ground connection wall 1, the wall thickness is 800mm, the width is 6.0m, and the buried depth is 26m. It is poured with C45 underwater concrete; The burial depth is 26m, poured with C25 ultra-retarded concrete; 3 occlusal piles, 1000mm in diameter, 700mm away from adjacent piles, 300mm in occlusal, 26m deep, poured with C45 underwater concrete; 4 rotary grouting piles, 1000mm in diameter , with a buried depth of 26m, 4 rotary grouting piles interlocked by 300mm, tangent to the ground connection wall 1, occlusal pile 2, and occlusal pile 3, poured with ordinary Portland cement with a label of 42.5; steel f...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention belongs to the technical field of construction engineering, and relates to a water-stopping method at the joint of an occlusal pile and an underground continuous wall. The occlusal piles and the occlusal piles are arranged at intervals and interlocked to form an occlusal pile. The ground connection wall and the adjacent occlusal piles The plain pile is occluded, the steel flower tube is welded on the steel cage on the adjacent side of the ground connection wall and the adjacent occlusal pile plain pile, the grouting pipe is buried outside the joint between the occlusal pile plain pile and the ground connection wall, and the rotary grouting pile is installed on the occlusion The outer side of the joint between the plain pile and the ground connection wall is occluded with the adjacent pile body through the ground connection wall, steel flower pipes are buried between the ground connection wall wall and the occlusal pile, and double-row grout is placed outside the joint between the ground connection wall and the occlusal pile. A series of structures and measures such as the grout pipe, and the rotary grouting pile reinforcement on the outside of the occlusal pile and the ground connection wall have solved the problem of water-stopping at the joint between the occlusal pile and the underground diaphragm wall, and improved the waterproof and anti-leakage performance of the joint. Enhance the stability and safety of the foundation pit.

Description

Technical field: [0001] The invention belongs to the technical field of construction engineering, and relates to a water-stopping method at the joint between an occlusal pile and an underground continuous wall of a foundation pit support structure. Background technique: [0002] With more and more subway projects in our country, all kinds of buildings around the foundation pits of urban subways are dense, the surrounding environment and water and land geological conditions are complex, and the construction is difficult. It is necessary to explore new foundation pit support methods. [0003] At present, the foundation pit support forms commonly used in subway engineering include occlusal piles and underground diaphragm walls. The occlusal pile refers to the foundation pit support structure formed by the interlocking of reinforced concrete piles and plain piles between the adjacent piles in the row of piles arranged in the plane, which is used as the foundation pit support str...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E02D29/16E02D31/02E02D17/04
CPCE02D17/04E02D29/16E02D31/02
Inventor 郭海涛韩超宁凯飞
Owner THE FOURTH ENG CO LTD OF CHINA RAILWAYNO 20 BUREAU GRP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Eureka Blog
Learn More
PatSnap group products