Elevator shaft formwork system and construction method
A construction method and elevator shaft technology, which are applied in the direction of formwork/formwork/work frame, connectors of formwork/formwork/work frame, preparation of building components on site, etc., can solve the problem of reducing the construction efficiency of aluminum formwork pouring, reducing the Problems such as wall strength and increased labor intensity of staff can be achieved to reduce the possibility of deformation, reduce labor intensity, and increase strength
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0061] The present invention will be described in further detail below in conjunction with the accompanying drawings.
[0062] Such as figure 1 and figure 2 As shown, the elevator shaft formwork system includes: side formwork 1, side formwork 1 is arranged on the inner and outer sides of the elevator shaft to be formed, and the top formwork 2 is arranged on the top of the side formwork 1, and the top formwork 2 is arranged along the elevator shaft to be formed. Around the circumference of the top formwork 2, a plurality of first locking holes 21 are opened on the side wall of the top formwork 2, and the first locking holes 21 are arranged at intervals along the extension direction of the top formwork 2, combined with Figure 4 and Figure 5 A plurality of second locking holes 11 matching the first locking holes 21 are provided on the side wall of the side formwork 1 close to the top formwork 2, and the first locking holes 21 and the second locking holes 11 pass through Locki...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 