Construction Method of Composite Pile Based on Field-wide and Full-period Field Measured Data
A technology based on measured data and construction methods, which is applied in the fields of basic structure engineering, basic structure test, on-site foundation soil survey, etc. It can solve the problems of inconsistent construction effect with design requirements, insufficient bearing capacity, long construction period, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0017] A composite pile construction method based on the full-scale and full-period measured data of the foundation, using an intelligent multifunctional mixing shaft with a sensing system, and setting sensing elements in the entire foundation composed of core piles, peripheral piles and pile surrounding soil to form a measurement system. It integrates the geological survey functions of in-situ testing, geophysical prospecting, and ultrasonic CT imaging; and the information collected in the whole cycle before, during, and after construction is analyzed by the analysis system to obtain the results, and the subsequent construction parameters are adjusted in real time according to the actual situation; The peripheral piles are cement-soil piles or extruded concrete piles, and the core piles are prefabricated piles.
[0018] The intelligent multifunctional stirring shaft with a sensing system utilizes a static penetrating sounder on the stirring shaft to conduct a static penetratin...