[0033] A construction method for erecting T-beams in narrow spaces adjacent to existing lines, such as figure 1 shown, including the following steps:
[0034] 1) Construction preparation:
[0035] ① Check and accept the T beam with the supervisor, check the geometric dimensions, appearance quality and waterproof and drainage facilities of the beam; check and mark whether the T beam matches the corresponding pier, check the center line, center of gravity line and T beam installation direction, and Mark well, be clear, accurate and eye-catching;
[0036] ② Measure and release the cross line of the T-beam support, and check the span of the bridge;
[0037] ③ Near the existing line, close the hard isolation fence and anti-collision isolation pier, and paste reflective strips on the existing equipment to make the logo obvious;
[0038] ④Foundation testing, timely replacement of...