An anti-seepage method for construction of underwater caps in areas with dissolved pores and dissolved pores
A technology for developing areas and dissolving gaps, applied in infrastructure engineering, construction, etc., can solve problems such as high construction cost, poor plugging effect, and long disposal time
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0025] The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.
[0026] like Figure 1~3 , this embodiment is used for anti-seepage treatment of the underwater cofferdam. After the cofferdam 1 is put in place, the bottom sealing concrete 2 is poured in the cofferdam 1, and then all the water in the cofferdam 1 is drained to form an environment for dry construction. . Observe the water seepage on the surface of the back-sealing concrete 2, confirm the water seepage point on the back-sealing concrete 2, and start plugging at the water seepage point.
[0027] like Figure 1~3 As shown, the blocking structure of this embodiment is an isolation chamber structure, and the isolation chamber adopts a hollow cover structure with an open lower end. As long as the structure meets this condition, it can meet the requirements of this embodiment. What the isolated bin of this embodiment selects is channel ste...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com