Building wall building wall brick jointing treatment construction device and method
A technology for building walls and construction equipment, applied in the direction of building structure, construction, etc., can solve the problems of slow filling process, large area, and the failure of joint filling to achieve the effect of delaying the solidification time
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0037]Embodiments of the present invention will be described below with reference to the drawings. In the process, in order to ensure the clarity and convenience of illustration, we may exaggerate the width of the lines or the size of the constituent elements in the diagram.
[0038] In addition, the following terms are defined based on the functions in the present invention, and may be different according to the user's or operator's intention or practice. Therefore, these terms are defined based on the entire content of this specification.
[0039] Such as Figure 1 to Figure 5 As shown, a kind of construction equipment for building wall construction and wall brick joint filling treatment, including alignment material frame 1, pressing handle group 2, heating device 3, material spraying head 4 and pressing cleaning device 5, described alignment material frame The rear end of 1 is provided with a pressing handle group 2, and the front end of the pressing handle group 2 is eq...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com