Multi-point collaborative loading control method for assembly of prefabricated underground structures
A prefabricated assembly and underground structure technology, applied in underwater structures, infrastructure engineering, lifting devices, etc., can solve problems such as inadequate assembly of prefabricated structural components, inability to achieve tension, structural damage, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0028] see figure 1 , shows a prefabricated assembly structure applying the present invention, which is composed of seven assembled components, including the bottom middle horizontal block A, the left horizontal block B1, the right horizontal block B2, and the left middle vertical block C1 , the right middle vertical block C2, the top horizontal block D, and the top end block E. Generally speaking, when assembling a prefabricated structure, the first block is assembled from the bottom middle horizontal block, and the left horizontal block B1 and The right horizontal block B2 is assembled as the second and third blocks, the left middle vertical block C1 and the right middle vertical block C2 are assembled as the fourth and fifth blocks, and the top horizontal block D is assembled as the sixth block , the top termination block E is assembled as the seventh block, that is, the last block, and those skilled in the art know that the present invention can be applied to prefabricated...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com