Abstract
Description
technical field
[0001] The invention relates to the technical field of bridge construction equipment, in particular to a prefabricated slab track transfer device for large bridge construction. Background technique
[0002] Equipment for bridge construction can be used for bridge construction, including prefabricated slabs for bridge construction, but it is inconvenient to transfer prefabricated slabs during bridge construction.
[0003] 1. When moving on the bridge deck, the bridge deck cannot be transferred until it is condensed. It needs to wait for a section of the bridge deck to be condensed before it can be used, and then transport the prefabricated slabs for the next section of bridge construction, which greatly prolongs the construction period.
[0004] 2. When the prefabricated slab is hoisted and transferred by a crane, the transfer range is small, which is not suitable for the construction of a bridge with a long length.
[0005] 3. When the prefabricated panels a...