Cascade reservoir optimal operation method based on cascade reservoir operation coefficients

A technology of cascade reservoirs and operating coefficients, applied in data processing applications, system integration technology, information technology support systems, etc., can solve the constraints that are difficult to apply, the inability to provide stable power delivery during dry seasons, and unreasonable cascade reservoir scheduling and operation strategies And other issues

Active Publication Date: 2020-03-31
ELECTRIC POWER RESEARCH INSTITUTE OF STATE GRID QINGHAI ELECTRIC POWER COMPANY +2
View PDF9 Cites 6 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] However, cascade hydropower output is largely limited by natural runoff, and other constraints such as shipping and irrigation must also be considered
Unreasonable cascade reservoir scheduling and operation strategies may lead to severe water abandonment during wet seasons, and prominent problems such as inability to provide stable power delivery during dry seasons
The general short-term coordination optimization method is difficult to apply to the constraints under different seasonal conditions. The analysis of the wind-hydro hybrid power generation system in the basin needs to fully consider the different tasks undertaken by the hydropower units and the seasonal differences in boundary conditions such as water inflow and storage capacity.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Cascade reservoir optimal operation method based on cascade reservoir operation coefficients
  • Cascade reservoir optimal operation method based on cascade reservoir operation coefficients
  • Cascade reservoir optimal operation method based on cascade reservoir operation coefficients

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0063] Example 1, such as figure 1 As shown, the present invention provides a kind of cascade reservoir optimization operation method based on cascade reservoir operation coefficient, and its method is the following steps:

[0064] Step 1: Calculate the operating coefficient of cascade reservoirs;

[0065] The second step: establish the cascade reservoir operation coefficient optimization model;

[0066] The third step: carry out comprehensive solution;

[0067] The first step is the specific method of calculating the operation coefficient of the cascade reservoir: for the cascade hydropower station in the lower reaches of the Yalong River, the peak distribution coefficient of the reservoir is proposed and base load factor It is defined as follows:

[0068]

[0069]

[0070] mn=1,2,...,12 corresponds to the operation coefficient of each month, i=1,2,...,5 corresponds to 5 cascade hydropower stations; x and d are the indices of ten days and days respectively, x=1,2 ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to the technical field of cascade reservoir operation, in particular to a cascade reservoir optimal operation method based on cascade reservoir operation coefficients, which is characterized by comprising the following steps of: 1, calculating the cascade reservoir operation coefficients; 2, establishing a cascade reservoir operation coefficient optimization model; and 3, carrying out comprehensive solution. The method has the beneficial effects that two indexes of the reservoir peak distribution coefficient and the base load coefficient are provided, and how to distribute the residual electric quantity of the system among the cascade hydropower stations in the research period and how to distribute the total power generation capacity of the hydropower stations in timesequence are determined. The minimum of the maximum output power shortage rate in a month is taken as an optimization target; conditions such as cascade reservoir output constraint, reservoir capacity constraint, flow constraint and hydraulic relation constraint are considered, an optimization model of cascade reservoir operation coefficients is established, a cascade hydropower space-time optimization distribution result is obtained through solving, and the method has important guiding significance for long-term planning and construction of a new energy base.

Description

technical field [0001] The invention relates to the technical field of cascade reservoir operation, in particular to a cascade reservoir optimization operation method based on the cascade reservoir operation coefficient. Background technique [0002] With the increasingly severe environmental problems, the large-scale utilization of renewable energy such as wind power, photovoltaic and hydropower has become a research hotspot. Studies have shown that natural resources such as wind, light, and water have good spatio-temporal complementary characteristics, and the wind-solar-hydro hybrid power generation system can improve the stability of the active power output of the system, and at the same time increase the level of renewable energy consumption. Southwest my country is rich in natural resources such as wind energy, solar energy, and water energy, and has the natural advantage of building a multi-energy complementary power generation system. [0003] Compared with traditio...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/04G06Q50/06
CPCG06Q10/04G06Q50/06Y04S10/50Y02E40/70
Inventor 胡伟范越张鸿轩康钧戚宇辰傅国斌孙云超肖明
Owner ELECTRIC POWER RESEARCH INSTITUTE OF STATE GRID QINGHAI ELECTRIC POWER COMPANY
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products