Suspender structure of high-speed railway arch bridge
A technology for high-speed railways and arch bridges, applied in arch bridges, bridges, bridge parts, etc., can solve problems such as difficulty in installation or replacement of hangers or slings, hidden dangers of bridge safety, corrosion of the lower ends of hangers, etc., to improve the convenience of replacement and installation. Fast and convenient, the effect of preventing anchorage from rusting
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0032] Such as Figure 1~2 As shown, a suspender structure of a high-speed railway arch bridge includes an exposed exposed steel tie rod 7, the upper end of the exposed steel tie rod 7 is connected with the protruding end of the arch rib pre-embedded steel tie rod 3 through a connecting assembly, and the exposed steel tie rod 7. The lower end is connected to the protruding end of the embedded steel tie rod 9 of the beam body through the connecting assembly. The nut 11 is fixed, and the spherical washer 10 at the tension end of the beam body and the spherical nut 11 at the tension end of the beam body form a drainage channel to avoid water accumulation.
[0033] The upper end of the arch rib pre-embedded steel tie rod 3 passes through the steel tube concrete arch and is fixed by the spherical nut 1 at the fixed end of the arch rib and the spherical washer 2 at the fixed end of the arch rib.
[0034] The spherical washer 10 at the tension end of the beam body, the spherical nut...
Embodiment 2
[0042] Such as Figure 3~4 As shown, a suspender structure of a high-speed railway arch bridge includes an exposed exposed steel tie rod 7, the upper end of the exposed steel tie rod 7 is connected with the protruding end of the arch rib pre-embedded steel tie rod 3 through a connecting assembly, and the exposed steel tie rod 7. The lower end is connected to the protruding end of the embedded steel tie rod 9 of the beam body through the connecting assembly. The nut 11 is fixed, and the spherical washer 10 at the tension end of the beam body and the spherical nut 11 at the tension end of the beam body form a drainage channel to avoid water accumulation.
[0043] The upper end of the arch rib pre-embedded steel tie rod 3 passes through the steel tube concrete arch and is fixed by the spherical nut 1 at the fixed end of the arch rib and the spherical washer 2 at the fixed end of the arch rib.
[0044] The spherical washer 10 at the tension end of the beam body, the spherical nut...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com