Anchor Length Design Method Based on Displacement Difference/Gradient in Underground Engineering
A technology of underground engineering and design methods, applied in design optimization/simulation, instruments, geometric CAD, etc., can solve the problems of low support construction efficiency, achieve the effect of improving construction efficiency and reducing support costs
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0019] The specific embodiments of the present invention are described below to facilitate those skilled in the art to understand the present invention, but it should be clear that the present invention is not limited to the scope of the specific embodiments. For those skilled in the art, as long as various changes Such changes are obvious within the spirit and scope of the present invention as defined and determined by the appended claims, and all inventions and creations utilizing the inventive concept are within the scope of protection.
[0020] All " / " mentioned in this scheme means or means.
[0021] refer to figure 1 , figure 1 A flow chart showing an anchor length design method based on displacement difference / gradient in underground engineering; as figure 1 As shown, the method includes steps 101 to 107 .
[0022] In step 101, the method of numerical simulation or model test is used to obtain the surrounding rock parameters of the surrounding rock in the underground...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com