Construction method of embedded connection structure between pier and foundation
A construction method and embedded technology, applied in the direction of bridges, bridge construction, bridge parts, etc., can solve the problems of poor fatigue resistance and durability, high requirements for pre-embedded anchor bolts, poor stability and pullout resistance, etc. , to achieve the effect of saving construction costs, reducing construction procedures, and simple assembly methods
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0040] Such as Figure 2-Figure 3 As shown, an embedded connection structure between a bridge pier and the foundation, including a corbel 3 and an enlarged head 4 arranged in sequence at the bottom of the bridge pier 1, and a cup that matches the enlarged head 4 is provided in the foundation 2 mouth 25, the enlarged head 4 is placed in the cup mouth 25, and the planar size of the corbel 3 is larger than the opening size of the cup mouth 25, and the corbel 3 presses against the top surface of the foundation 2 , Concrete is poured between the enlarged head 4 and the mouth of the cup 25 .
[0041] The enlarging head 4 is a platform structure, and its elevation outline is trapezoidal, and the length of the upper bottom is less than the length of the lower end, that is, in the vertical direction, from top to bottom, the cross-sectional area of the enlarging head 4 gradually increases .
[0042] Such as Figure 4 As shown, the foundation 2 is assembled by a first assembling par...
Embodiment 2
[0046] A construction method of an embedded connection structure between a bridge pier and a foundation, comprising the following steps:
[0047] Step 1: Prefabricate the first assembly part 21 and the second assembly part 22 of the foundation 2 respectively in the factory;
[0048] Step 2: Install the first assembling part 21 at the designed position;
[0049] Step 3: hoisting the pier 1, pushing the enlarged head 4 of the pier 1 into the cup opening 25 of the foundation 2 from the side;
[0050] Step 4: Align the stop tenon 24 of the second assembling part 22 with the stop hole 23 of the first assembling part 21, so that the second assembling part 22 and the first assembling part 21 are connected and fixed;
[0051] Step five: pouring concrete, pouring the pier 1 and the foundation 2 into a whole, thereby completing the prefabricated assembly.
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com



