Oil and gas pipeline water area pipe-jacking tunnel crossing engineering design method based on water filling operation
A technology for oil and gas pipeline and engineering design, applied in the direction of instruments, geometric CAD, etc., can solve the problems of adverse effects on the entire line of engineering, failure to repair and maintain, etc., and achieve the effects of safety assurance, strength satisfaction, and corrosion mitigation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Example Embodiment
[0017] In order to enable those of ordinary skill in the art to more clearly understand the purpose, technical solutions, and advantages of the present invention, the present invention will be further described below with reference to the accompanying drawings and embodiments.
[0018] Such as Figure 1-2 As shown, the design method of a pipe jacking tunnel crossing project based on water filling operation for oil and gas pipeline waters in the present invention includes the following steps:
[0019] (A) In view of the complexity of pipeline installation of pipe jacking tunnels in waters, specific classifications are made on the methods of operation after pipeline installation, and a practical filling method is proposed based on the classification situation. The filling method is water filling operation, which is effective in monitoring natural gas While leaking, fix the pipeline to prevent the pipeline from instability, and ensure that it can enter the tunnel again for maintenance...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap