Edge bonding machine and power failure glue leaking prevention device thereof
An edge-banding machine and leak-proof technology, which is applied to devices and coatings that apply liquid to the surface, can solve problems such as glue leakage and affect the normal operation of the glue shaft, and achieve the effect of solving glue leakage.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0049] Embodiment 1, the power-off and anti-leakage glue device of the edge banding machine of the present invention includes a lower air blowing assembly and an upper air blowing assembly, the lower air blowing assembly is installed on the upper end of the glue shaft of the edge banding machine gluing mechanism 7, and the upper air blowing The assembly and the lower air blowing assembly are aligned up and down and locked and fixed by fasteners, and the upper air blowing assembly is equipped with a blowing delay air path communicating with the air blowing cavity.
[0050]The lower air blowing assembly is provided with a lower air groove, and the bottom of the lower air groove is provided with an air blowing port 8, and the upper air blowing assembly is provided with an upper air groove. When the upper air blowing component and the lower air blowing component are combined up and down, the lower air groove and the upper air groove will combine to form an air blowing cavity. When...
Embodiment 2
[0066] Embodiment 2, this embodiment is basically the same as Embodiment 1, the specific difference is that the blowing delay air circuit includes a solenoid valve, a pressure regulating valve, a blowing air pipe and a delay circuit, and the delay circuit includes Time relay, contactor and UPS power supply.
[0067] The air inlet of the solenoid valve V1 is connected to the air source 20 through a pipeline, and the air outlet is connected to the air blowing pipe 6 through the pressure regulating valve V4, and the air blowing pipe 6 is connected to the air blowing cavity.
[0068] After the solenoid coil of the solenoid valve V1 is connected in series with the switch contact of the time relay KT-2 and the switch contact of the contactor K-1 in sequence, it is connected in series with the UPS power supply, and the UPS power supply is electrically connected with the equipment power supply.
[0069] The coil of the contactor KT-1 is connected with the equipment power supply.
[0...