Construction process of large-diameter lock-catch steel pipe pile entering rock
A construction technology and steel pipe pile technology, applied in sheet pile wall, foundation structure engineering, measurement and other directions, can solve the problems of high cost consumption, slow efficiency, high consumption of roller cones, etc., and achieve fast rock penetration, high work efficiency, The effect of high slag discharge wind speed
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0032] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention will be further elaborated below.
[0033] join figure 1 As shown, the present invention discloses a large-diameter locking steel pipe pile into the rock construction process, which includes the following steps:
[0034] (1) Rotary drilling preformed holes
[0035] The pre-formed hole adopts SANY360 / 365 rotary drilling drill, and the pre-formed hole construction is carried out by the rotary drilling work. The pre-formed hole is determined according to the diameter, length and other parameters of the steel pipe pile. The construction method of the rotary drilling is a conventional technology, which is not added here. To repeat: backfill sand and remove the casing after pre-forming the hole. The diameter of the casing covers the entire locking steel pipe pile. The diameter of the casing in this application is 1200mm. ...