Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Train operation adjusting method, device and system, and train

An adjustment method and train technology, applied in the field of train communication, can solve the problems of low adjustment efficiency, adjustment delay, waste of train-ground communication network resources, etc., and achieve the effect of accurate and efficient adjustment and lightening load

Active Publication Date: 2020-07-03
BYD CO LTD
View PDF10 Cites 5 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] In the prior art, the ATS collects the actual arrival or departure time of the train, adjusts the stop time of the train at the station and / or the running time of the next section, and calculates the adjusted stop time of the train at the station and / or the running time of the next interval is sent to the train, which will lead to adjustment delays and low adjustment efficiency. In addition, the transmission of ATS and train information wastes train-ground communication network resources

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Train operation adjusting method, device and system, and train
  • Train operation adjusting method, device and system, and train
  • Train operation adjusting method, device and system, and train

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0035] Embodiments of the present invention are described in detail below, examples of which are shown in the drawings, wherein the same or similar reference numerals designate the same or similar elements or elements having the same or similar functions throughout. The embodiments described below by referring to the figures are exemplary and are intended to explain the present invention and should not be construed as limiting the present invention.

[0036] The following describes the train operation adjustment method, device, system and train according to the embodiments of the present invention with reference to the accompanying drawings.

[0037] In order to solve the above technical problems, the present invention proposes a train operation adjustment method, which realizes the active adjustment of train operation, makes the train adjustment more accurate and efficient, and reduces the load of the train-ground communication network.

[0038] figure 1 is a flowchart of a ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a train operation adjusting method, device and system, and a train. The method comprises the following steps: building communication connection with an ATS, and receiving an operation plan transmitted by the ATS; driving according to the operation plan; when the train arrives at the station, comparing the actual arrival time with a planned arrival time, and if the train arrives early or late, enabling the train to adjust the stop time of the train at the station and the running time of the train in the next section in order to make the actual arrival time of the train arriving at the next station consistent with the planned arrival time; and when the train leaves the station, comparing the actual departure time with the planned departure time, and if the train arrives early or late, adjusting the operation time of the train in the next interval by the train in order to make the actual arrival time of the train reaching the next station consistent with the planned arrival time. Therefore, active adjustment of train operation is realized, the adjustment of the train is more accurate and efficient, and the load of a train-ground communication network is reduced.

Description

technical field [0001] The invention relates to the technical field of train communication, in particular to a train operation adjustment method, device, system and train. Background technique [0002] At present, ATS (Automatic Train Supervision System, automatic train monitoring system) collects the actual arrival or departure time of the train when the train arrives or leaves the station, and compares the actual arrival or departure time with the arrival or departure time of the train operation plan. Station time for comparison. When the train arrives at the station, if the train is early or late, ATS adjusts the stop time of the train at the station and the running time of the next section, and sends it to the train, and the train receives the stop time of the station and the next section When the train leaves the station, if the train is early or late, ATS will adjust the running time of the train in the next section, and Send it to the train, and the train will calcu...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): B61L27/04
CPCB61L27/04B61L27/40
Inventor 刘伟钊苏波薄云览卓开阔
Owner BYD CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products