Optimal scheduling method and system for comprehensive energy system
An integrated energy system and optimized dispatching technology, which is applied in the fields of climate change adaptation, parallel feeding arrangement of single network, load balancing of AC network, etc. It can solve the problems of inflexible power output of cogeneration units, curtailment of wind, uncontrollability, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0033] figure 1 It is a flowchart of an optimal scheduling method for an integrated energy system provided by an embodiment of the present invention.
[0034] refer to figure 1 , the optimal scheduling method of the integrated energy system includes:
[0035] Step S101, obtaining the topology structure of the integrated energy system and the basic information of electrical equipment;
[0036] Step S102, establishing a system equipment model including an energy storage device according to the basic information of the electrical equipment;
[0037] Step S103, construct the system objective function and constraint conditions, and use the mixed integer programming method to solve the problem to obtain the optimal scheduling analysis results of the integrated energy system.
[0038] According to an exemplary embodiment of the present invention, the basic information of the electrical equipment includes unit type, unit capacity, charging power, heat storage power and electricity ...
Embodiment 2
[0059] figure 2 It is a schematic diagram of an optimal scheduling system of an integrated energy system provided by an embodiment of the present invention.
[0060] refer to figure 2 , the optimal scheduling system of the integrated energy system includes:
[0061] An acquisition unit 10, configured to acquire the topological structure of the integrated energy system and basic information of electrical equipment;
[0062] A model building unit 20, configured to set up a system equipment model containing an energy storage device according to the basic information of the electrical equipment;
[0063] The optimal scheduling unit 30 is used to construct the system objective function and constraints, and use the mixed integer programming method to solve the problem to obtain the optimal scheduling analysis results of the integrated energy system.
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


