Construction error information obtaining method and device

A technology for construction errors and acquisition methods, applied in design optimization/simulation, geometric CAD, etc., can solve the problems of reducing the accuracy of construction monitoring, wasting human resources and time costs, etc.

Pending Publication Date: 2020-07-24
FUJIAN HUICHUAN DIGITAL TECH
View PDF3 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, in practice, it is found that the traditional monitoring method needs to rely on tools such as measuring rulers and rulers for construction monitoring, so that the monitoring results will be affected by the subjectiv

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction error information obtaining method and device
  • Construction error information obtaining method and device
  • Construction error information obtaining method and device

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0054] Please see figure 1 , figure 1 A schematic flowchart of a method for acquiring construction error information is provided for the embodiment of the present application. The method for obtaining construction error information can be applied to any construction scene. Specifically, the method can be applied to a construction scene with a camera device, and the method can be used when the camera device obtains real-time construction information. Wherein, the method for obtaining the construction error information includes:

[0055] S101. Obtain a building information model.

[0056] In this embodiment, the building information model may be a BIM (Building Information Modeling, building information modeling or building information modeling) model.

[0057] In this embodiment, no limitation is imposed on the acquisition method.

[0058] In this embodiment, the acquisition method can be to identify the architectural design drawings and automatically establish a building i...

Embodiment 2

[0093] Please see figure 2 , figure 2 It is a schematic flowchart of another method for obtaining construction error information provided in the embodiment of the present application. figure 2 The flow diagram of the described acquisition method of construction error information is based on figure 1 The flow diagram of the described method for obtaining construction error information is improved. Wherein, the method for obtaining the construction error information includes:

[0094] S201. Obtain a building construction design drawing.

[0095] In this embodiment, the building construction design drawings are used to illustrate the specific construction standards of the building, including various data such as size, material, quality, etc., and there is no limitation here.

[0096] In this embodiment, there is no limitation on the acquisition method in this embodiment.

[0097] S202. Extract the building construction design information included in the building construct...

Embodiment 3

[0138] Please see image 3 , image 3 It is a schematic structural diagram of an acquisition device for construction error information provided in an embodiment of the present application. Wherein, the acquisition device of the construction error information includes:

[0139] A first acquiring unit 310, configured to acquire a building information model;

[0140] The second acquiring unit 320 is configured to acquire the building construction video;

[0141] The first generating unit 330 is configured to generate a construction partial model according to the building construction video;

[0142] The second generation unit 340 is configured to generate construction error information according to the building information model and the construction partial model.

[0143] In this embodiment, for the explanation of the device for obtaining construction error information, reference may be made to the description in Embodiment 1 or Embodiment 2, and details will not be repeated...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The embodiment of the invention provides a construction error information obtaining method and device, and relates to the field of building construction. The method comprises the steps of: obtaining abuilding information model; obtaining a building construction video; generating a construction local model according to the building construction video; and generating construction error informationaccording to the building information model and the construction local model. Visibly, by implementing the implementation mode, the purpose of construction monitoring can be achieved, and then consumption of a large number of human resources and time cost is avoided.

Description

technical field [0001] The present application relates to the field of building construction, in particular, to a method and device for acquiring construction error information. Background technique [0002] At present, with the continuous development of society, more and more buildings have sprung up, adding a lot of color to the society. However, a hundred-foot-high building rises from the ground, no matter which building is in the construction process, construction personnel need to monitor the error between the construction process and the design parameters, so that the construction of the building can avoid corresponding errors. However, in practice, it is found that the traditional monitoring method needs to rely on tools such as measuring rulers and rulers for construction monitoring, so that the monitoring results will be affected by the subjective consciousness of the monitoring personnel and the incompleteness and inaccuracy of monitoring data, thereby reducing the...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G06F30/13G06F30/20
Inventor 郑文张翔林恒
Owner FUJIAN HUICHUAN DIGITAL TECH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products