Construction error information obtaining method and device
A technology for construction errors and acquisition methods, applied in design optimization/simulation, geometric CAD, etc., can solve the problems of reducing the accuracy of construction monitoring, wasting human resources and time costs, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0054] Please see figure 1 , figure 1 A schematic flowchart of a method for acquiring construction error information is provided for the embodiment of the present application. The method for obtaining construction error information can be applied to any construction scene. Specifically, the method can be applied to a construction scene with a camera device, and the method can be used when the camera device obtains real-time construction information. Wherein, the method for obtaining the construction error information includes:
[0055] S101. Obtain a building information model.
[0056] In this embodiment, the building information model may be a BIM (Building Information Modeling, building information modeling or building information modeling) model.
[0057] In this embodiment, no limitation is imposed on the acquisition method.
[0058] In this embodiment, the acquisition method can be to identify the architectural design drawings and automatically establish a building i...
Embodiment 2
[0093] Please see figure 2 , figure 2 It is a schematic flowchart of another method for obtaining construction error information provided in the embodiment of the present application. figure 2 The flow diagram of the described acquisition method of construction error information is based on figure 1 The flow diagram of the described method for obtaining construction error information is improved. Wherein, the method for obtaining the construction error information includes:
[0094] S201. Obtain a building construction design drawing.
[0095] In this embodiment, the building construction design drawings are used to illustrate the specific construction standards of the building, including various data such as size, material, quality, etc., and there is no limitation here.
[0096] In this embodiment, there is no limitation on the acquisition method in this embodiment.
[0097] S202. Extract the building construction design information included in the building construct...
Embodiment 3
[0138] Please see image 3 , image 3 It is a schematic structural diagram of an acquisition device for construction error information provided in an embodiment of the present application. Wherein, the acquisition device of the construction error information includes:
[0139] A first acquiring unit 310, configured to acquire a building information model;
[0140] The second acquiring unit 320 is configured to acquire the building construction video;
[0141] The first generating unit 330 is configured to generate a construction partial model according to the building construction video;
[0142] The second generation unit 340 is configured to generate construction error information according to the building information model and the construction partial model.
[0143] In this embodiment, for the explanation of the device for obtaining construction error information, reference may be made to the description in Embodiment 1 or Embodiment 2, and details will not be repeated...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com