Pipe jacking construction process

A construction technique and pipe jacking technology, applied in mining equipment, earthwork drilling, tunnels, etc., can solve the problems of long time consumption, reduced head turnover rate, low efficiency, etc., so as to improve construction efficiency and significantly improve turnover rate. Effect

Active Publication Date: 2020-07-31
ANHUI KAIYUAN HIGHWAY & BRIDGE +1
View PDF11 Cites 5 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] Pipe jacking machines are often seen in conventional mud-water balance (earth pressure balance) construction. In the above-mentioned mud-water balance construction process, the pipe jacking machine presses the unit pipe joint and can only push in one direction at a time. This is because it is used for The cylinder body of the jack that pushes the unit pipe joint into the hole needs to be supported by the backrest. The backrest is set in the opposite direction of jacking. The above-mentioned backrest is mostly a concrete backrest. The bottom of the working well is made of concrete as a backrest, and it takes 2 to 3 days to ensure that the backrest is completely solidified, and then the jack is installed. Therefore, when the pipe jacking operation is performed on the unit pipe joint, the efficiency is low, and the other end of the hole is implemented. During the pipe jacking operation of pipe joints, it is necessary to reinstall the track and re-adjust the machine head, which takes a long time and reduces the turnover rate of the machine head

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Pipe jacking construction process
  • Pipe jacking construction process
  • Pipe jacking construction process

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0031] refer to Figure 1 to Figure 9 , the structural features of this pipe jacking construction equipment are described in detail as follows:

[0032] A pipe jacking construction equipment, comprising a pre-embedded steel plate 20 arranged in a working well 10, the pre-embedded steel plate 20 is provided with an installation position for fixing a cylinder body of a jack 30, and the pre-embedded steel plate 20 is provided with at least two Push the push plate 40 of the pipe joint of the unit. The surface of the push plate 40 is arranged vertically and symmetrically on the embedded steel plate 20. The oil cylinder of the jack 30 is activated and the push plate 40 moves horizontally. The push plate 40 abuts against one end of the unit pipe joint and moves toward the opening of the working well 10;

[0033] combine Figure 1 to Figure 5 As shown, before the pipe jacking equipment is hoisted into the working well 10, the working well 10 needs to be excavated first, and the work...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a pipe jacking construction process. The pipe jacking construction process comprises the following steps: determining a jacking route and excavating a working well in the middle part position of the jacking route; using truss hoisting equipment to hoist an embedded steel plate and a supporting rod in the working well so that the embedded steel plate is stably attached to the bottom of the working well, and fixing the embedded steel plate at the bottom of the working well through installing nuts; making the rod end of the supporting rod abut against the hole wall of theworking well and fasten with an embedded bolt in the inner wall of the working well through a nut; hoisting a single unit pipe section to a material receiving carriage so that the pipe orifice of theunit pipe section corresponds to the hole of the well; and using a jack to move a push plate horizontally, and pushing the unit pipe section into the well hole to complete the jacking of the single unit pipe section until the unit pipe sections are arranged in the well. The pipe jacking construction process can significantly improve the turnover utilization rate of the machine head, and further can significantly improve the construction efficiency of the pipe jacking.

Description

technical field [0001] The invention relates to the technical field of engineering, in particular to a pipe jacking construction technology. Background technique [0002] Pipe jacking machines are often seen in conventional mud-water balance (earth pressure balance) construction. In the above-mentioned mud-water balance construction process, the pipe jacking machine presses the unit pipe joint and can only push in one direction at a time. This is because it is used for The cylinder body of the jack that pushes the unit pipe joint into the hole needs to be supported by the backrest. The backrest is set in the opposite direction of jacking. The above-mentioned backrest is mostly a concrete backrest. The bottom of the working well is made of concrete as a backrest, and it takes 2 to 3 days to ensure that the backrest is completely solidified, and then the jack is installed. Therefore, when the pipe jacking operation is performed on the unit pipe joint, the efficiency is low, an...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E21D9/00
CPCE21D9/00
Inventor 潘晨璐袁凌超姚智琪彭开颜陈大超李静
Owner ANHUI KAIYUAN HIGHWAY & BRIDGE