A road maintenance and construction method technology, applied to roads, roads, on-site coagulation pavements, etc., can solve the problems of not determining the number of sprayed layers according to the road surface conditions, and can not completely solve the road surface problems, so as to eliminate road surface diseases , save repair time and manpower, improve the effect of anti-skid performance
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0048] A construction method for a sand-mist seal in road maintenance provided in this embodiment comprises the following steps:
[0049] S1. Enter the road section to be maintained, and re-distribute the lanes on the road section to be maintained. According to the road conditions, it can be completely closed, or a diversion lane can be reserved to control road traffic to avoid coating or coating. When the layer is not dry, the vehicle enters the repair section.
[0050]S2. Test the water seepage coefficient, friction coefficient, and structure depth of the road section to be maintained, determine the exact ratio of raw materials for the seal layer containing sand and mist according to the water seepage coefficient, friction coefficient, and structure depth of the above test, and prepare the spray according to the above ratio liquid; the details are as follows: the proportioning range of raw materials by volume for the spray liquid is:
[0051] MasterSeal Concentrate Coversto...
Embodiment 2
[0078] The construction method of a kind of fine anti-skid sealing layer of the present embodiment, it differs from embodiment one in that;
[0079] S2. Test the water seepage coefficient, friction coefficient, and structure depth of the road section to be maintained, determine the exact ratio of raw materials for the seal layer containing sand and mist according to the water seepage coefficient, friction coefficient, and structure depth of the above test, and prepare the spray according to the above ratio liquid; the details are as follows: the proportioning range of raw materials by volume for the spray liquid is:
[0080] MasterSeal Concentrate Coverstock 100L
[0081] water 25L
[0082] TopTuff Polymer Additive 4L;
[0083] According to the ratio of raw materials by volume of the above-mentioned spraying liquid, the amount of fine sand added in step S6 is 50 kg. The details are as follows
[0084]
[0085] Through the test and comparison of the pavement conditions b...