Project progress visualization method and system based on work structure decomposition

A project progress and project technology, applied in the field of project progress visualization method and system based on work structure decomposition, can solve the problem of inconvenient adjustment of project progress chart, achieve the effect of flexible editing and improve production efficiency

Inactive Publication Date: 2020-09-01
国家电网有限公司技术学院分公司 +2
View PDF7 Cites 4 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The current project schedule takes a lot of time to determine milestones and monitoring points, and the obtained project schedule is not easy to adjust, fo

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Project progress visualization method and system based on work structure decomposition
  • Project progress visualization method and system based on work structure decomposition

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0028] This embodiment discloses a project progress visualization method based on work structure decomposition, such as figure 1 shown, including the following steps:

[0029] Step 1: Collect the progress data of various types of historical projects in advance, construct the project decomposition structure diagrams of various projects, and obtain a set of standardized project decomposition structure diagrams.

[0030] The progress data includes subtasks included in the project and corresponding completion time.

[0031] The project decomposition structure diagram preferably adopts a tree diagram, which divides the project into multiple first-level subtasks, and each first-level subtask is divided into multiple second-level subtasks...until each subtask cannot be divided. That is, the root node represents the entire project, the second-level node represents the first-level subtask, ..., and the leaf node represents the lowest-level subtask of the subtask, and, for a certain su...

Embodiment 2

[0053] The purpose of this embodiment is to provide a project progress visualization system based on work structure decomposition, and the system includes:

[0054] The item type determination module receives the item name and identifies the item type, or receives the specified item type;

[0055] The project decomposition structure diagram generation module obtains the corresponding project decomposition structure diagram from the set of standardized project decomposition structure diagrams according to the project type; wherein, the standardized project decomposition structure diagram set is constructed according to the project progress data of various project categories owned;

[0056] The initial progress diagram visualization module generates an initial project progress diagram, and visualizes the initial project progress diagram, or visualizes the initial project progress diagram and the project decomposition architecture diagram;

[0057] The progress diagram editing m...

Embodiment 3

[0059] The purpose of this embodiment is to provide an electronic device.

[0060] An electronic device includes a memory, a processor, and a computer program stored in the memory and operable on the processor. The processor implements the method described in Embodiment 1 when executing the program.

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a project progress visualization method and system based on work structure decomposition, and the method comprises the following steps: receiving a project name and recognizinga project type to which the project name belongs, or receiving a specified project type; according to the project type, obtaining a corresponding project decomposition architecture diagram from a standardized project decomposition architecture diagram set, wherein the standardized project decomposition architecture diagram set is constructed according to project progress data of various project categories; generating an initial project progress chart, and visualizing the initial project progress chart, or visualizing the initial project progress chart and the project decomposition architecture chart; and receiving an editing operation on the initial project progress diagram and/or the project decomposition architecture diagram, and correspondingly updating the project progress diagram andthe corresponding project decomposition architecture diagram every time the editing operation is received. According to the invention, the progress chart can be quickly generated, and flexible editing can be carried out as required.

Description

technical field [0001] The invention belongs to the technical field of data visualization, and in particular relates to a project progress visualization method and system based on work structure decomposition. Background technique [0002] The statements in this section merely provide background information related to the present invention and do not necessarily constitute prior art. [0003] Work Breakdown Structure (WBS, Work Breakdown Structure), as the center of the project management system, includes decomposition according to the physical structure of the product, the function of the product or project, the implementation process, the region or distribution of the project, the various goals, departments, and functions of the project, Decomposition methods include using a tree structure for decomposition, or team-centered, top-down and bottom-up full communication, one-to-one individual communication and discussion, and decomposition of individual tasks. The criterion ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G06Q10/10G06F16/904
CPCG06Q10/103G06F16/904
Inventor 张哲战杰林桂华高洪雨张之明张耀坤崔金涛齐一星刘玉文尹辉燕郭凯丽韩文敬
Owner 国家电网有限公司技术学院分公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products