Topology identification method of low-voltage distribution station area
An identification method and low-voltage power distribution technology, applied in electrical components, circuit devices, sustainable buildings, etc., can solve the problems of common high-voltage crosstalk in the station area, low frequency of power frequency communication, etc., to achieve simple control, simple function implementation, logical clear effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0028] Embodiment 1, see figure 2 , taking the rightmost branch as an example.
[0029] Step A, TTU as the root node, periodically generates topology identification commands and sends them through the downlink module in the power distribution box of the root node; the ID of the branch monitoring unit in the power distribution box of the root node is ID0, and ID0 is added to the topology identification command.
[0030] Step B. After the branch monitoring unit of the first-level distribution box ID3 receives the topology identification command through the uplink module, it adds its own ID, ID3, to the topology identification command, and sends the topology identification command through the downlink module. The topology identification command includes ID0 and ID3 .
[0031] The second-level distribution box ID8 completes the same steps, and the topology identification command includes ID0, ID3, and ID8.
[0032] After the upstream module of the final distribution box ID12 re...
Embodiment 2
[0047] Example 2, see figure 2 , taking the leftmost branch as an example.
[0048] Step A, TTU, as the root node, periodically generates topology identification commands and sends them through the downlink module in the power distribution box of the root node; the waiting time in the topology identification commands is T=3 seconds.
[0049] Step B: After receiving the topology identification command through the uplink module, the branch monitoring unit of the first-level distribution box ID1 changes the waiting time in the topology identification command to 1.8 seconds, and sends the topology identification command through the downlink module.
[0050] In step C, after the branch monitoring unit of ID4 receives the topology identification command through the upstream module, there will be no upload command because there is no lower-level distribution box. After waiting for 1.8 seconds, add its own ID to the topology identification command and send it through the uplink modu...
Embodiment 3
[0056] Embodiment 3, see figure 2 , taking the middle branch as an example.
[0057] Assume that ID10 is a newly added distribution box and has not been updated to the topology. In this case, the TTU can initiate topology identification, and incorporate the newly added node into the topology of the station.
[0058] The invention provides a method, which can start the topology identification process by the branch monitoring unit in the newly added distribution box, and incorporate it into the topology of the station area.
[0059] The topology identification process is started by sending a topology identification command through the downlink module.
[0060] After ID10 sends the topology identification command through the downlink module, since there is no lower distribution box, after waiting for a period of time, the topology identification command is sent through the uplink module, and the topology identification command includes ID10.
[0061] The ID6 branch monitoring...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com