Cascade hydropower day-ahead scheduling method considering power grid section constraints
A scheduling method and cascade technology, applied in instrumentation, data processing applications, forecasting, etc., can solve problems such as complex transmission section constraints
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0070] The technical solutions in the embodiments of the present invention are clearly and completely described below in conjunction with the accompanying drawings of the present invention. Apparently, the described embodiments are only some of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
[0071] Such as figure 1 As shown, a cascade hydropower day-ahead scheduling method considering grid section constraints includes the following steps:
[0072] S1. Establish a cascade hydropower optimization model. The objective function of the model includes the maximum cascade power generation and the minimum total variance of the residual load of the grid:
[0073] The maximum cascade power generation is expressed as:
[0074]
[0075] The minimum total variance ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


