Working platform task price estimation method
A work platform and work task technology, applied in instruments, business, data processing applications, etc., can solve the problems of inaccurate calculation of task coefficients, low price accuracy, etc., and achieve the effect of quickly adjusting calculation methods or scoring methods, and accurate classification.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0031] refer to Figure 1-2 , a method for estimating the price of a work platform task, comprising the following steps:
[0032] S1: Data collection, the contracting party publishes the work task data information requirements to the work platform, and the work platform receives various tasks;
[0033] S2: Task classification, divide all tasks into statistics and then classify them. They are initially divided into three categories: general, industrial design and software development. Different categories use different evaluation methods to facilitate accurate reference estimates;
[0034] S3: Evaluate tasks. The important references for evaluating tasks are work cost (workload and hours), urgency (priority), and scarcity of human resources (task queue length). The unit of measurement for workload is h, and the urgency is divided into There are 5 categories, specifically 10 points for fast (within 0.5 days), 8 points for urgent (within 1 day), 6 points for general (2-3 days), ...
Embodiment 2
[0046] refer to Figure 1-2 , a method for estimating the price of a work platform task, comprising the following steps:
[0047] S1: Data collection, the contracting party publishes the work task data information requirements to the work platform, and the work platform receives various tasks;
[0048] S2: Task classification, divide all tasks into statistics and then classify them. They are initially divided into three categories: general, industrial design and software development. Different categories use different evaluation methods to facilitate accurate reference estimates;
[0049] S3: Evaluate tasks. The important references for evaluating tasks are work cost (workload and hours), urgency (priority), and scarcity of human resources (task queue length). The unit of measurement for workload is h, and the urgency is divided into There are 5 categories, specifically 10 points for fast (within 0.5 days), 8 points for urgent (within 1 day), 6 points for general (2-3 days), ...
Embodiment 3
[0061] refer to Figure 1-2 , a method for estimating the price of a work platform task, comprising the following steps:
[0062] S1: Data collection, the contracting party publishes the work task data information requirements to the work platform, and the work platform receives various tasks;
[0063] S2: Task classification, divide all tasks into statistics and then classify them. They are initially divided into three categories: general, industrial design and software development. Different categories use different evaluation methods to facilitate accurate reference estimates;
[0064] S3: Evaluate tasks. The important references for evaluating tasks are work cost (workload and hours), urgency (priority), and scarcity of human resources (task queue length). The unit of measurement for workload is h, and the urgency is divided into There are 5 categories, specifically 10 points for fast (within 0.5 days), 8 points for urgent (within 1 day), 6 points for general (2-3 days), ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com